Work Done for Punching Hole Formula

Fx Copy
LaTeX Copy
Work is done when a force that is applied to an object moves that object. Check FAQs
W=Fst
W - Work?Fs - Shear Force?t - Thickness of The Material to be Punched?

Work Done for Punching Hole Example

With values
With units
Only example

Here is how the Work Done for Punching Hole equation looks like with Values.

Here is how the Work Done for Punching Hole equation looks like with Units.

Here is how the Work Done for Punching Hole equation looks like.

10.8Edit=4000Edit2.7Edit
You are here -
HomeIcon Home » Category Physics » Category Mechanical » Category Theory of Machine » fx Work Done for Punching Hole

Work Done for Punching Hole Solution

Follow our step by step solution on how to calculate Work Done for Punching Hole?

FIRST Step Consider the formula
W=Fst
Next Step Substitute values of Variables
W=4000N2.7mm
Next Step Convert Units
W=4000N0.0027m
Next Step Prepare to Evaluate
W=40000.0027
LAST Step Evaluate
W=10.8J

Work Done for Punching Hole Formula Elements

Variables
Work
Work is done when a force that is applied to an object moves that object.
Symbol: W
Measurement: EnergyUnit: J
Note: Value can be positive or negative.
Shear Force
Shear Force is the force which causes shear deformation to occur in the shear plane.
Symbol: Fs
Measurement: ForceUnit: N
Note: Value can be positive or negative.
Thickness of The Material to be Punched
Thickness of The Material to be Punched is the measure of the smallest dimension of the material.
Symbol: t
Measurement: LengthUnit: mm
Note: Value should be greater than 0.

Other formulas in Turning Moment Diagrams and Flywheel category

​Go Accelerating Torque on Rotating Parts of Engine
Ta=T-Tm
​Go Coefficient of Steadiness
Ms=NN1-N2
​Go Coefficient of Steadiness given Coefficient of Fluctuation of Speed
Ms=1Cs
​Go Mean Angular Speed
ω=ω1+ω22

How to Evaluate Work Done for Punching Hole?

Work Done for Punching Hole evaluator uses Work = Shear Force*Thickness of The Material to be Punched to evaluate the Work, Work Done for Punching Hole formula is defined as the energy transferred when a force is applied to an object, resulting in its displacement, typically measured in joules, and is a crucial concept in the context of Turning Moment Diagrams and Flywheel. Work is denoted by W symbol.

How to evaluate Work Done for Punching Hole using this online evaluator? To use this online evaluator for Work Done for Punching Hole, enter Shear Force (Fs) & Thickness of The Material to be Punched (t) and hit the calculate button.

FAQs on Work Done for Punching Hole

What is the formula to find Work Done for Punching Hole?
The formula of Work Done for Punching Hole is expressed as Work = Shear Force*Thickness of The Material to be Punched. Here is an example- 10.8 = 4000*0.0027.
How to calculate Work Done for Punching Hole?
With Shear Force (Fs) & Thickness of The Material to be Punched (t) we can find Work Done for Punching Hole using the formula - Work = Shear Force*Thickness of The Material to be Punched.
Can the Work Done for Punching Hole be negative?
Yes, the Work Done for Punching Hole, measured in Energy can be negative.
Which unit is used to measure Work Done for Punching Hole?
Work Done for Punching Hole is usually measured using the Joule[J] for Energy. Kilojoule[J], Gigajoule[J], Megajoule[J] are the few other units in which Work Done for Punching Hole can be measured.