Work Done by Load for Small Extension of Rod Formula

Fx Copy
LaTeX Copy
Work Done by Load on a system is energy transferred to the system from its surroundings. Check FAQs
w=Pimpacth
w - Work Done by Load?Pimpact - Impact Load?h - Height through which load is dropped?

Work Done by Load for Small Extension of Rod Example

With values
With units
Only example

Here is how the Work Done by Load for Small Extension of Rod equation looks like with Values.

Here is how the Work Done by Load for Small Extension of Rod equation looks like with Units.

Here is how the Work Done by Load for Small Extension of Rod equation looks like.

7.5Edit=3Edit2500Edit
You are here -
HomeIcon Home » Category Physics » Category Mechanical » Category Strength of Materials » fx Work Done by Load for Small Extension of Rod

Work Done by Load for Small Extension of Rod Solution

Follow our step by step solution on how to calculate Work Done by Load for Small Extension of Rod?

FIRST Step Consider the formula
w=Pimpacth
Next Step Substitute values of Variables
w=3kN2500mm
Next Step Convert Units
w=3000N2.5m
Next Step Prepare to Evaluate
w=30002.5
Next Step Evaluate
w=7500J
LAST Step Convert to Output's Unit
w=7.5KJ

Work Done by Load for Small Extension of Rod Formula Elements

Variables
Work Done by Load
Work Done by Load on a system is energy transferred to the system from its surroundings.
Symbol: w
Measurement: EnergyUnit: KJ
Note: Value can be positive or negative.
Impact Load
The Impact Load is the load dropped from a particular height.
Symbol: Pimpact
Measurement: ForceUnit: kN
Note: Value should be greater than 0.
Height through which load is dropped
The height through which load is dropped is a measure of vertical distance, either vertical extent or vertical position.
Symbol: h
Measurement: LengthUnit: mm
Note: Value should be greater than 0.

Other formulas in Strain Energy stored in a Body when Load is applied with Impact category

​Go Value of Load Applied with Impact given Work Done by Load
Pimpact=wh
​Go Height through which Load is Dropped using Work done by Load
h=wPimpact
​Go Stress Induced in Rod due to Impact Load
σinduced=2EbarPimpacthALbar
​Go Load Dropped given Stress Induced in Rod due to Impact Load
Pimpact=σinduced2ALbar2Ebarh

How to Evaluate Work Done by Load for Small Extension of Rod?

Work Done by Load for Small Extension of Rod evaluator uses Work Done by Load = Impact Load*Height through which load is dropped to evaluate the Work Done by Load, The Work Done by Load for Small Extension of Rod formula is defined as a measure of energy transfer that occurs when an object is moved over a distance by an external force. Work Done by Load is denoted by w symbol.

How to evaluate Work Done by Load for Small Extension of Rod using this online evaluator? To use this online evaluator for Work Done by Load for Small Extension of Rod, enter Impact Load (Pimpact) & Height through which load is dropped (h) and hit the calculate button.

FAQs on Work Done by Load for Small Extension of Rod

What is the formula to find Work Done by Load for Small Extension of Rod?
The formula of Work Done by Load for Small Extension of Rod is expressed as Work Done by Load = Impact Load*Height through which load is dropped. Here is an example- 0.0075 = 3000*2.5.
How to calculate Work Done by Load for Small Extension of Rod?
With Impact Load (Pimpact) & Height through which load is dropped (h) we can find Work Done by Load for Small Extension of Rod using the formula - Work Done by Load = Impact Load*Height through which load is dropped.
Can the Work Done by Load for Small Extension of Rod be negative?
Yes, the Work Done by Load for Small Extension of Rod, measured in Energy can be negative.
Which unit is used to measure Work Done by Load for Small Extension of Rod?
Work Done by Load for Small Extension of Rod is usually measured using the Kilojoule[KJ] for Energy. Joule[KJ], Gigajoule[KJ], Megajoule[KJ] are the few other units in which Work Done by Load for Small Extension of Rod can be measured.
Copied!