Fx Copy
LaTeX Copy
Work Done by Load on a system is energy transferred to the system from its surroundings. Check FAQs
w=LavgD
w - Work Done by Load?Lavg - Average Load?D - Distance moved by top face?

Work Done by Gradually Applied Shear Force given Average Load Example

With values
With units
Only example

Here is how the Work Done by Gradually Applied Shear Force given Average Load equation looks like with Values.

Here is how the Work Done by Gradually Applied Shear Force given Average Load equation looks like with Units.

Here is how the Work Done by Gradually Applied Shear Force given Average Load equation looks like.

18Edit=6Edit3000Edit
You are here -
HomeIcon Home » Category Physics » Category Mechanical » Category Strength of Materials » fx Work Done by Gradually Applied Shear Force given Average Load

Work Done by Gradually Applied Shear Force given Average Load Solution

Follow our step by step solution on how to calculate Work Done by Gradually Applied Shear Force given Average Load?

FIRST Step Consider the formula
w=LavgD
Next Step Substitute values of Variables
w=6kN3000mm
Next Step Convert Units
w=6000N3m
Next Step Prepare to Evaluate
w=60003
Next Step Evaluate
w=18000J
LAST Step Convert to Output's Unit
w=18KJ

Work Done by Gradually Applied Shear Force given Average Load Formula Elements

Variables
Work Done by Load
Work Done by Load on a system is energy transferred to the system from its surroundings.
Symbol: w
Measurement: EnergyUnit: KJ
Note: Value can be positive or negative.
Average Load
Average Load represents the average load on rectangular block over a period of time.
Symbol: Lavg
Measurement: ForceUnit: kN
Note: Value should be greater than 0.
Distance moved by top face
Distance moved by top face is a numerical measurement of how far apart objects or points are.
Symbol: D
Measurement: LengthUnit: mm
Note: Value should be greater than 0.

Other Formulas to find Work Done by Load

​Go Work Done by Gradually Applied Shear Force given Shear Stress
w=𝜏2VT2G
​Go Work Done by Gradually Applied Shear Force given Shear Strain
w=𝜏𝜂VT2

Other formulas in Strain Energy stored in a Body due to Shear Stress category

​Go Average Load Value given Work done by Gradually Applied Shear Force
Lavg=wD
​Go Shear Stress Produced given Work Done by Gradually Applied Shear Force
𝜏=2GwVT
​Go Shear Strain Produced given Work Done by Gradually Applied Shear Force
𝜂=2w𝜏VT
​Go Strain Energy Stored in Body due to Shear Stress
Ubody=𝜏2VT2G

How to Evaluate Work Done by Gradually Applied Shear Force given Average Load?

Work Done by Gradually Applied Shear Force given Average Load evaluator uses Work Done by Load = Average Load*Distance moved by top face to evaluate the Work Done by Load, The Work Done by Gradually Applied Shear Force given Average Load formula is defined as measure of energy transfer that occurs when an object is moved over a distance by an external force. Work Done by Load is denoted by w symbol.

How to evaluate Work Done by Gradually Applied Shear Force given Average Load using this online evaluator? To use this online evaluator for Work Done by Gradually Applied Shear Force given Average Load, enter Average Load (Lavg) & Distance moved by top face (D) and hit the calculate button.

FAQs on Work Done by Gradually Applied Shear Force given Average Load

What is the formula to find Work Done by Gradually Applied Shear Force given Average Load?
The formula of Work Done by Gradually Applied Shear Force given Average Load is expressed as Work Done by Load = Average Load*Distance moved by top face. Here is an example- 0.018 = 6000*3.
How to calculate Work Done by Gradually Applied Shear Force given Average Load?
With Average Load (Lavg) & Distance moved by top face (D) we can find Work Done by Gradually Applied Shear Force given Average Load using the formula - Work Done by Load = Average Load*Distance moved by top face.
What are the other ways to Calculate Work Done by Load?
Here are the different ways to Calculate Work Done by Load-
  • Work Done by Load=(Shear Stress in body^2*Volume of Body)/(2*Modulus of rigidity Of Bar)OpenImg
  • Work Done by Load=(Shear Stress in body*Shear Strain*Volume of Body)/2OpenImg
Can the Work Done by Gradually Applied Shear Force given Average Load be negative?
Yes, the Work Done by Gradually Applied Shear Force given Average Load, measured in Energy can be negative.
Which unit is used to measure Work Done by Gradually Applied Shear Force given Average Load?
Work Done by Gradually Applied Shear Force given Average Load is usually measured using the Kilojoule[KJ] for Energy. Joule[KJ], Gigajoule[KJ], Megajoule[KJ] are the few other units in which Work Done by Gradually Applied Shear Force given Average Load can be measured.
Copied!