Work done against friction in delivery pipe evaluator uses Work = (2/3)*Length of Stroke*Head loss due to friction in delivery pipe to evaluate the Work, The Work done against friction in delivery pipe formula is defined as the product of stroke length and head loss due to friction during delivery, multiplied by 2/3. Work is denoted by W symbol.
How to evaluate Work done against friction in delivery pipe using this online evaluator? To use this online evaluator for Work done against friction in delivery pipe, enter Length of Stroke (L) & Head loss due to friction in delivery pipe (hfd) and hit the calculate button.