Volume per unit Length of Shoreline is the volume of sediment contained within a cross-sectional area of the beach, per unit length along the shoreline. Check FAQs
V=W(B+Dc)
V - Volume per unit Length of Shoreline?W - Beach Width?B - Design Berm Elevation?Dc - Depth of Closure?

Volume per unit Length of Shoreline required to produce Beach Width Example

With values
With units
Only example

Here is how the Volume per unit Length of Shoreline required to produce Beach Width equation looks like with Values.

Here is how the Volume per unit Length of Shoreline required to produce Beach Width equation looks like with Units.

Here is how the Volume per unit Length of Shoreline required to produce Beach Width equation looks like.

255Edit=30Edit(2.5Edit+6Edit)
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Coastal and Ocean Engineering » fx Volume per unit Length of Shoreline required to produce Beach Width

Volume per unit Length of Shoreline required to produce Beach Width Solution

Follow our step by step solution on how to calculate Volume per unit Length of Shoreline required to produce Beach Width?

FIRST Step Consider the formula
V=W(B+Dc)
Next Step Substitute values of Variables
V=30m(2.5m+6m)
Next Step Prepare to Evaluate
V=30(2.5+6)
LAST Step Evaluate
V=255

Volume per unit Length of Shoreline required to produce Beach Width Formula Elements

Variables
Volume per unit Length of Shoreline
Volume per unit Length of Shoreline is the volume of sediment contained within a cross-sectional area of the beach, per unit length along the shoreline.
Symbol: V
Measurement: AreaUnit:
Note: Value should be greater than 0.
Beach Width
Beach Width is the horizontal distance from the shoreline to a specific point inland which can vary greatly depending on factors such as tide, season, and human intervention.
Symbol: W
Measurement: LengthUnit: m
Note: Value should be greater than 0.
Design Berm Elevation
Design Berm Elevation is a level space, shelf, or raised barrier (usually made of compacted soil) separating areas vertically, especially part-way up a long slope.
Symbol: B
Measurement: LengthUnit: m
Note: Value should be greater than 0.
Depth of Closure
Depth of Closure for a characteristic time interval is the most landward depth seaward of which there is no significant change in bottom elevation.
Symbol: Dc
Measurement: LengthUnit: m
Note: Value should be greater than 0.

Other Formulas to find Volume per unit Length of Shoreline

​Go Volume of Sand per unit Length of Shoreline placed before there is any Dry Beach after Equilibrium
V=(35)(DcAF)52(AN-AF)

Other formulas in Seawall Trap Ratio category

​Go Seawall Trap Ratio
WTR=VWTVs
​Go Wall Trap Volume given Seawall Trap Ratio
VWT=WTRVs
​Go Active Sediment Volume given Seawall Trap Ratio
Vs=VWTWTR
​Go Design Berm Elevation given Volume per unit Length of Shoreline
B=((VW)-Dc)

How to Evaluate Volume per unit Length of Shoreline required to produce Beach Width?

Volume per unit Length of Shoreline required to produce Beach Width evaluator uses Volume per unit Length of Shoreline = Beach Width*(Design Berm Elevation+Depth of Closure) to evaluate the Volume per unit Length of Shoreline, The Volume per unit Length of Shoreline required to produce Beach Width formula is defined as the case of healthy (sediment-rich), preprojective beach profile and fill material that has a median grain size equal to that of native beach sand. Volume per unit Length of Shoreline is denoted by V symbol.

How to evaluate Volume per unit Length of Shoreline required to produce Beach Width using this online evaluator? To use this online evaluator for Volume per unit Length of Shoreline required to produce Beach Width, enter Beach Width (W), Design Berm Elevation (B) & Depth of Closure (Dc) and hit the calculate button.

FAQs on Volume per unit Length of Shoreline required to produce Beach Width

What is the formula to find Volume per unit Length of Shoreline required to produce Beach Width?
The formula of Volume per unit Length of Shoreline required to produce Beach Width is expressed as Volume per unit Length of Shoreline = Beach Width*(Design Berm Elevation+Depth of Closure). Here is an example- 255 = 30*(2.5+6).
How to calculate Volume per unit Length of Shoreline required to produce Beach Width?
With Beach Width (W), Design Berm Elevation (B) & Depth of Closure (Dc) we can find Volume per unit Length of Shoreline required to produce Beach Width using the formula - Volume per unit Length of Shoreline = Beach Width*(Design Berm Elevation+Depth of Closure).
What are the other ways to Calculate Volume per unit Length of Shoreline?
Here are the different ways to Calculate Volume per unit Length of Shoreline-
  • Volume per unit Length of Shoreline=(3/5)*(Depth of Closure/Parameter for Fill Sands)^(5/2)*(Parameter for Native Sands-Parameter for Fill Sands)OpenImg
Can the Volume per unit Length of Shoreline required to produce Beach Width be negative?
No, the Volume per unit Length of Shoreline required to produce Beach Width, measured in Area cannot be negative.
Which unit is used to measure Volume per unit Length of Shoreline required to produce Beach Width?
Volume per unit Length of Shoreline required to produce Beach Width is usually measured using the Square Meter[m²] for Area. Square Kilometer[m²], Square Centimeter[m²], Square Millimeter[m²] are the few other units in which Volume per unit Length of Shoreline required to produce Beach Width can be measured.
Copied!