Fx Copy
LaTeX Copy
Volume of Wasted Sludge is the amount of sludge that is removed or wasted from a wastewater treatment process on a daily basis. Check FAQs
Qw'=(Qs(Qi-Q)BOD5BODu)-O2DO2X
Qw' - Volume of Wasted Sludge?Qs - Sewage Discharge?Qi - Influent BOD?Q - Effluent BOD?BOD5 - 5 Days BOD?BODu - Ultimate BOD?O2 - Theoretical Oxygen Requirement?DO2 - Oxygen Demand of Biomass?X - MLSS?

Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both Example

With values
With units
Only example

Here is how the Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both equation looks like with Values.

Here is how the Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both equation looks like with Units.

Here is how the Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both equation looks like.

0.0777Edit=(10Edit(13.2Edit-0.4Edit)1.36Edit2Edit)-2.5Edit2.02Edit1200Edit
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Environmental Engineering » fx Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both

Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both Solution

Follow our step by step solution on how to calculate Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both?

FIRST Step Consider the formula
Qw'=(Qs(Qi-Q)BOD5BODu)-O2DO2X
Next Step Substitute values of Variables
Qw'=(10m³/s(13.2mg/L-0.4mg/L)1.36mg/L2mg/L)-2.5mg/d2.021200mg/L
Next Step Convert Units
Qw'=(10m³/s(0.0132kg/m³-0.0004kg/m³)0.0014kg/m³0.002kg/m³)-2.9E-11kg/s2.021.2kg/m³
Next Step Prepare to Evaluate
Qw'=(10(0.0132-0.0004)0.00140.002)-2.9E-112.021.2
Next Step Evaluate
Qw'=0.0776548242940231m³/s
LAST Step Rounding Answer
Qw'=0.0777m³/s

Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both Formula Elements

Variables
Volume of Wasted Sludge
Volume of Wasted Sludge is the amount of sludge that is removed or wasted from a wastewater treatment process on a daily basis.
Symbol: Qw'
Measurement: Volumetric Flow RateUnit: m³/s
Note: Value should be greater than 0.
Sewage Discharge
Sewage Discharge is the flow rate of sewage when it is being discharged in the river.
Symbol: Qs
Measurement: Volumetric Flow RateUnit: m³/s
Note: Value should be greater than 0.
Influent BOD
Influent BOD is the total amount of BOD which is present in the incoming sewage.
Symbol: Qi
Measurement: DensityUnit: mg/L
Note: Value should be greater than 0.
Effluent BOD
Effluent BOD is the amount of BOD present in the outing sewage.
Symbol: Q
Measurement: DensityUnit: mg/L
Note: Value should be greater than 0.
5 Days BOD
5 Days BOD is an indicator of how much oxygen is utilized by a natural water sample in five days at 20 degrees C.
Symbol: BOD5
Measurement: DensityUnit: mg/L
Note: Value should be greater than 0.
Ultimate BOD
Ultimate BOD is the amount of oxygen required to decompose all of the organic material after infinite time.
Symbol: BODu
Measurement: DensityUnit: mg/L
Note: Value should be greater than 0.
Theoretical Oxygen Requirement
Theoretical Oxygen Requirement is the calculated amount of oxygen required to oxidize a compound to its final oxidation products.
Symbol: O2
Measurement: Mass Flow RateUnit: mg/d
Note: Value should be greater than 0.
Oxygen Demand of Biomass
Oxygen Demand of Biomass is the amount of oxygen required by the microorganisms to decompose organic matter present in biomass.
Symbol: DO2
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
MLSS
MLSS is the sum of volatile suspended solids (organics) and fixed suspended solids (inorganics).
Symbol: X
Measurement: DensityUnit: mg/L
Note: Value should be between 1000 to 6500.

Other Formulas to find Volume of Wasted Sludge

​Go Volume of Wasted Sludge Per Day given Oxygen Required in Aeration Tank
Qw'=(Qs(Qi-Q)f)-O21.42X
​Go Volume of Wasted Sludge Per Day given Oxygen Demand of Biomass
Qw'=(Qs(Qi-Q)f)-O2DO2X

How to Evaluate Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both?

Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both evaluator uses Volume of Wasted Sludge = (((Sewage Discharge*(Influent BOD-Effluent BOD))/(5 Days BOD/Ultimate BOD))-Theoretical Oxygen Requirement)/(Oxygen Demand of Biomass*MLSS) to evaluate the Volume of Wasted Sludge, The Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both formula is defined as the calculation of volume of wasted sludge per day when we have prior information of oxygen demand and ultimate BOD both. Volume of Wasted Sludge is denoted by Qw' symbol.

How to evaluate Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both using this online evaluator? To use this online evaluator for Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both, enter Sewage Discharge (Qs), Influent BOD (Qi), Effluent BOD (Q), 5 Days BOD (BOD5), Ultimate BOD (BODu), Theoretical Oxygen Requirement (O2), Oxygen Demand of Biomass (DO2) & MLSS (X) and hit the calculate button.

FAQs on Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both

What is the formula to find Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both?
The formula of Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both is expressed as Volume of Wasted Sludge = (((Sewage Discharge*(Influent BOD-Effluent BOD))/(5 Days BOD/Ultimate BOD))-Theoretical Oxygen Requirement)/(Oxygen Demand of Biomass*MLSS). Here is an example- 0.077655 = (((10*(0.0132-0.0004))/(0.00136/0.002))-2.89351851851852E-11)/(2.02*1.2).
How to calculate Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both?
With Sewage Discharge (Qs), Influent BOD (Qi), Effluent BOD (Q), 5 Days BOD (BOD5), Ultimate BOD (BODu), Theoretical Oxygen Requirement (O2), Oxygen Demand of Biomass (DO2) & MLSS (X) we can find Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both using the formula - Volume of Wasted Sludge = (((Sewage Discharge*(Influent BOD-Effluent BOD))/(5 Days BOD/Ultimate BOD))-Theoretical Oxygen Requirement)/(Oxygen Demand of Biomass*MLSS).
What are the other ways to Calculate Volume of Wasted Sludge?
Here are the different ways to Calculate Volume of Wasted Sludge-
  • Volume of Wasted Sludge=(((Sewage Discharge*(Influent BOD-Effluent BOD))/Ratio of BOD to Ultimate BOD)-Theoretical Oxygen Requirement)/(1.42*MLSS)OpenImg
  • Volume of Wasted Sludge=(((Sewage Discharge*(Influent BOD-Effluent BOD))/Ratio of BOD to Ultimate BOD)-Theoretical Oxygen Requirement)/(Oxygen Demand of Biomass*MLSS)OpenImg
  • Volume of Wasted Sludge=(((Sewage Discharge*(Influent BOD-Effluent BOD))/(5 Days BOD/Ultimate BOD))-Theoretical Oxygen Requirement)/(1.42*MLSS)OpenImg
Can the Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both be negative?
No, the Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both, measured in Volumetric Flow Rate cannot be negative.
Which unit is used to measure Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both?
Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both is usually measured using the Cubic Meter per Second[m³/s] for Volumetric Flow Rate. Cubic Meter per Day[m³/s], Cubic Meter per Hour[m³/s], Cubic Meter per Minute[m³/s] are the few other units in which Volume of Wasted Sludge Per Day given Oxygen Demand and Ultimate BOD Both can be measured.
Copied!