Value of Load Applied with Impact given Work Done by Load evaluator uses Impact Load = Work Done by Load/Height through which load is dropped to evaluate the Impact Load, The Value of Load Applied with Impact given Work Done by Load formula is defined as load applied with impact. Impact Load is denoted by Pimpact symbol.
How to evaluate Value of Load Applied with Impact given Work Done by Load using this online evaluator? To use this online evaluator for Value of Load Applied with Impact given Work Done by Load, enter Work Done by Load (w) & Height through which load is dropped (h) and hit the calculate button.