Tractive Effort at Edge of Pinion Formula

Fx Copy
LaTeX Copy
Pinion Edge Tractive Effort is the effective force acting on the wheel of the locomotive, necessary to propel the train. Check FAQs
Fpin=2τed1
Fpin - Pinion Edge Tractive Effort?τe - Engine Torque?d1 - Diameter of Pinion 1?

Tractive Effort at Edge of Pinion Example

With values
With units
Only example

Here is how the Tractive Effort at Edge of Pinion equation looks like with Values.

Here is how the Tractive Effort at Edge of Pinion equation looks like with Units.

Here is how the Tractive Effort at Edge of Pinion equation looks like.

64Edit=24Edit0.125Edit
You are here -
HomeIcon Home » Category Engineering » Category Electrical » Category Utilization of Electrical Energy » fx Tractive Effort at Edge of Pinion

Tractive Effort at Edge of Pinion Solution

Follow our step by step solution on how to calculate Tractive Effort at Edge of Pinion?

FIRST Step Consider the formula
Fpin=2τed1
Next Step Substitute values of Variables
Fpin=24N*m0.125m
Next Step Prepare to Evaluate
Fpin=240.125
LAST Step Evaluate
Fpin=64N

Tractive Effort at Edge of Pinion Formula Elements

Variables
Pinion Edge Tractive Effort
Pinion Edge Tractive Effort is the effective force acting on the wheel of the locomotive, necessary to propel the train.
Symbol: Fpin
Measurement: ForceUnit: N
Note: Value can be positive or negative.
Engine Torque
Engine Torque is defined as the torque generated by the motor of a vehicle.
Symbol: τe
Measurement: TorqueUnit: N*m
Note: Value should be greater than 0.
Diameter of Pinion 1
The Diameter of Pinion 1 is known as when two gears run together, the one with the smaller number of teeth is called the pinion and its diameter is pinion diameter.
Symbol: d1
Measurement: LengthUnit: m
Note: Value should be greater than 0.

Other formulas in Tractive Effort category

​Go Total Tractive Effort Required for Propulsion of Train
Ftrain=For+Fog+F
​Go Tractive Effort at Wheel
Fw=Fpind2d
​Go Tractive Effort during Acceleration
Fα=(277.8Weα)+(WRsp)
​Go Tractive Effort on Driven Wheel
Fw=iio(ηdl100)Tpprd

How to Evaluate Tractive Effort at Edge of Pinion?

Tractive Effort at Edge of Pinion evaluator uses Pinion Edge Tractive Effort = (2*Engine Torque)/Diameter of Pinion 1 to evaluate the Pinion Edge Tractive Effort, The Tractive Effort at edge of pinion formula is defined as the ratio of two times of torque to the diameter of the pinion. Pinion Edge Tractive Effort is denoted by Fpin symbol.

How to evaluate Tractive Effort at Edge of Pinion using this online evaluator? To use this online evaluator for Tractive Effort at Edge of Pinion, enter Engine Torque e) & Diameter of Pinion 1 (d1) and hit the calculate button.

FAQs on Tractive Effort at Edge of Pinion

What is the formula to find Tractive Effort at Edge of Pinion?
The formula of Tractive Effort at Edge of Pinion is expressed as Pinion Edge Tractive Effort = (2*Engine Torque)/Diameter of Pinion 1. Here is an example- 64 = (2*4)/0.125.
How to calculate Tractive Effort at Edge of Pinion?
With Engine Torque e) & Diameter of Pinion 1 (d1) we can find Tractive Effort at Edge of Pinion using the formula - Pinion Edge Tractive Effort = (2*Engine Torque)/Diameter of Pinion 1.
Can the Tractive Effort at Edge of Pinion be negative?
Yes, the Tractive Effort at Edge of Pinion, measured in Force can be negative.
Which unit is used to measure Tractive Effort at Edge of Pinion?
Tractive Effort at Edge of Pinion is usually measured using the Newton[N] for Force. Exanewton[N], Meganewton[N], Kilonewton[N] are the few other units in which Tractive Effort at Edge of Pinion can be measured.
Copied!