Total Tool Changing Cost using Total Production Cost Formula

Fx Copy
LaTeX Copy
Total Tool Changing Cost involves accounting for both the direct and indirect expenses related to the tool change process. Check FAQs
Cct=Ctp-NC(ts+t)-NtC
Cct - Total Tool Changing Cost?Ctp - Total Production Cost?N - Batch Size?C - Cost of a Tool?ts - Setup Time?t - Machining Time?Nt - Number of Tools Used?

Total Tool Changing Cost using Total Production Cost Example

With values
With units
Only example

Here is how the Total Tool Changing Cost using Total Production Cost equation looks like with Values.

Here is how the Total Tool Changing Cost using Total Production Cost equation looks like with Units.

Here is how the Total Tool Changing Cost using Total Production Cost equation looks like.

7200Edit=30000Edit-2Edit80Edit(54Edit+87Edit)-3Edit80Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Total Tool Changing Cost using Total Production Cost

Total Tool Changing Cost using Total Production Cost Solution

Follow our step by step solution on how to calculate Total Tool Changing Cost using Total Production Cost?

FIRST Step Consider the formula
Cct=Ctp-NC(ts+t)-NtC
Next Step Substitute values of Variables
Cct=30000-280(54s+87s)-380
Next Step Prepare to Evaluate
Cct=30000-280(54+87)-380
LAST Step Evaluate
Cct=7200

Total Tool Changing Cost using Total Production Cost Formula Elements

Variables
Total Tool Changing Cost
Total Tool Changing Cost involves accounting for both the direct and indirect expenses related to the tool change process.
Symbol: Cct
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Total Production Cost
Total Production Cost involves summing up various cost components associated with the machining process.
Symbol: Ctp
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: N
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost of a Tool
Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Symbol: C
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Machining Time
Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Symbol: t
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Total Production Cost category

​Go Total Production Cost for given Batch Size
Ctp=NCp
​Go Total Production Cost
Ctp=N(C(ts+t))+Nt(Ctc+C)

How to Evaluate Total Tool Changing Cost using Total Production Cost?

Total Tool Changing Cost using Total Production Cost evaluator uses Total Tool Changing Cost = Total Production Cost-Batch Size*Cost of a Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of a Tool to evaluate the Total Tool Changing Cost, The Total Tool Changing Cost using Total Production Cost is a method to determine the total cost that arises due to the time taken by the operator in changing the Cutting Tool when he is paid by the hour during the manufacturing of a batch of components. Total Tool Changing Cost is denoted by Cct symbol.

How to evaluate Total Tool Changing Cost using Total Production Cost using this online evaluator? To use this online evaluator for Total Tool Changing Cost using Total Production Cost, enter Total Production Cost (Ctp), Batch Size (N), Cost of a Tool (C), Setup Time (ts), Machining Time (t) & Number of Tools Used (Nt) and hit the calculate button.

FAQs on Total Tool Changing Cost using Total Production Cost

What is the formula to find Total Tool Changing Cost using Total Production Cost?
The formula of Total Tool Changing Cost using Total Production Cost is expressed as Total Tool Changing Cost = Total Production Cost-Batch Size*Cost of a Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of a Tool. Here is an example- 7200 = 30000-2*80*(54+87)-3*80.
How to calculate Total Tool Changing Cost using Total Production Cost?
With Total Production Cost (Ctp), Batch Size (N), Cost of a Tool (C), Setup Time (ts), Machining Time (t) & Number of Tools Used (Nt) we can find Total Tool Changing Cost using Total Production Cost using the formula - Total Tool Changing Cost = Total Production Cost-Batch Size*Cost of a Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of a Tool.
Copied!