Total Tool Changing Cost using Average Production Cost Formula

Fx Copy
LaTeX Copy
Total Tool Changing Cost involves accounting for both the direct and indirect expenses related to the tool change process. Check FAQs
Tcc=Nb(Cpr-Ct(ts+tm))-NtCt
Tcc - Total Tool Changing Cost?Nb - Batch Size?Cpr - Production Cost of Each Component?Ct - Cost of a Tool?ts - Setup Time?tm - Machining Time?Nt - Number of Tools Used?

Total Tool Changing Cost using Average Production Cost Example

With values
With units
Only example

Here is how the Total Tool Changing Cost using Average Production Cost equation looks like with Values.

Here is how the Total Tool Changing Cost using Average Production Cost equation looks like with Units.

Here is how the Total Tool Changing Cost using Average Production Cost equation looks like.

7200Edit=2Edit(11400Edit-80Edit(0.45Edit+1.15Edit))-3Edit80Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Total Tool Changing Cost using Average Production Cost

Total Tool Changing Cost using Average Production Cost Solution

Follow our step by step solution on how to calculate Total Tool Changing Cost using Average Production Cost?

FIRST Step Consider the formula
Tcc=Nb(Cpr-Ct(ts+tm))-NtCt
Next Step Substitute values of Variables
Tcc=2(11400-80(0.45min+1.15min))-380
Next Step Convert Units
Tcc=2(11400-80(27s+69s))-380
Next Step Prepare to Evaluate
Tcc=2(11400-80(27+69))-380
LAST Step Evaluate
Tcc=7200

Total Tool Changing Cost using Average Production Cost Formula Elements

Variables
Total Tool Changing Cost
Total Tool Changing Cost involves accounting for both the direct and indirect expenses related to the tool change process.
Symbol: Tcc
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Production Cost of Each Component
Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Symbol: Cpr
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost of a Tool
Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Symbol: Ct
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Machining Time
Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Symbol: tm
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Average Production Cost category

​Go Number of Tools used given Average Production Cost
Nt=NbCpr-Ct(ts+tm)Cttc+Ct
​Go Number of Tools used given Average Production Time
Nt=Nbtp-(ts+tm)tc

How to Evaluate Total Tool Changing Cost using Average Production Cost?

Total Tool Changing Cost using Average Production Cost evaluator uses Total Tool Changing Cost = Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool to evaluate the Total Tool Changing Cost, The Total Tool Changing Cost using Average Production Cost refers to the portion of the total production cost that is attributed to the time and resources required to change tools during the manufacturing process. This cost includes the labor, machine downtime, and any associated expenses incurred each time a tool is changed. Total Tool Changing Cost is denoted by Tcc symbol.

How to evaluate Total Tool Changing Cost using Average Production Cost using this online evaluator? To use this online evaluator for Total Tool Changing Cost using Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm) & Number of Tools Used (Nt) and hit the calculate button.

FAQs on Total Tool Changing Cost using Average Production Cost

What is the formula to find Total Tool Changing Cost using Average Production Cost?
The formula of Total Tool Changing Cost using Average Production Cost is expressed as Total Tool Changing Cost = Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool. Here is an example- 7200 = 2*(11400-80*(27+69))-3*80.
How to calculate Total Tool Changing Cost using Average Production Cost?
With Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm) & Number of Tools Used (Nt) we can find Total Tool Changing Cost using Average Production Cost using the formula - Total Tool Changing Cost = Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool.
Copied!