Total Tool Changing Cost given Individual Costs evaluator uses Total Tool Changing Cost = Total Production Cost-(Total Machining and Operating Cost+Total Non Productive Cost+Total Cost of Tools Used) to evaluate the Total Tool Changing Cost, Total Tool Changing Cost given Individual Costs refers to the cumulative expenses associated with changing and maintaining cutting tools during the manufacturing process. Tool changing is a critical aspect of machining operations, particularly in processes like CNC machining, where different tools are used sequentially to perform various machining operations on a workpiece. Total Tool Changing Cost is denoted by Ct symbol.
How to evaluate Total Tool Changing Cost given Individual Costs using this online evaluator? To use this online evaluator for Total Tool Changing Cost given Individual Costs, enter Total Production Cost (Cp), Total Machining and Operating Cost (Cm), Total Non Productive Cost (Cnp) & Total Cost of Tools Used (c) and hit the calculate button.