Total Production Time is the net time taken to produce a complete match of products, including overheads. Check FAQs
TPT=(Nbts+Nbtm+Nttc)
TPT - Total Production Time?Nb - Batch Size?ts - Setup Time?tm - Machining Time?Nt - Number of Tools Used?tc - Time to Change One Tool?

Total Production Time given Time for Individual Operation and Batch Size Example

With values
With units
Only example

Here is how the Total Production Time given Time for Individual Operation and Batch Size equation looks like with Values.

Here is how the Total Production Time given Time for Individual Operation and Batch Size equation looks like with Units.

Here is how the Total Production Time given Time for Individual Operation and Batch Size equation looks like.

1100Edit=(2Edit54Edit+2Edit46Edit+3Edit300Edit)
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Total Production Time given Time for Individual Operation and Batch Size

Total Production Time given Time for Individual Operation and Batch Size Solution

Follow our step by step solution on how to calculate Total Production Time given Time for Individual Operation and Batch Size?

FIRST Step Consider the formula
TPT=(Nbts+Nbtm+Nttc)
Next Step Substitute values of Variables
TPT=(254s+246s+3300s)
Next Step Prepare to Evaluate
TPT=(254+246+3300)
LAST Step Evaluate
TPT=1100s

Total Production Time given Time for Individual Operation and Batch Size Formula Elements

Variables
Total Production Time
Total Production Time is the net time taken to produce a complete match of products, including overheads.
Symbol: TPT
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Batch Size
Batch Size is the count of similar kinds of products to be manufactured.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Machining Time
Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material.
Symbol: tm
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Time to Change One Tool
Time to Change One Tool is the measure of time it takes to change one tool during machining.
Symbol: tc
Measurement: TimeUnit: s
Note: Value should be greater than 0.

Other Formulas to find Total Production Time

​Go Total Production Time
TPT=(TMT+NPT+TCT)
​Go Total Production Time given Total Machining and Operating Cost
TPT=CmM

Other formulas in Total Production Time category

​Go Total Non-Productive Time
NPT=Nbts
​Go Size of Batch using Total Non-Productive Time
Nb=NPTts
​Go Load or Unload or Setup Time given Total Non-Productive Time
ts=NPTNb
​Go Total Machining Time or Total Machine Time
TMT=Nbtm

How to Evaluate Total Production Time given Time for Individual Operation and Batch Size?

Total Production Time given Time for Individual Operation and Batch Size evaluator uses Total Production Time = (Batch Size*Setup Time+Batch Size*Machining Time+Number of Tools Used*Time to Change One Tool) to evaluate the Total Production Time, The Total Production Time given Time for Individual Operation and Batch Size is defined as the total time it takes to produce a complete batch of components from scratch. Total Production Time is denoted by TPT symbol.

How to evaluate Total Production Time given Time for Individual Operation and Batch Size using this online evaluator? To use this online evaluator for Total Production Time given Time for Individual Operation and Batch Size, enter Batch Size (Nb), Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button.

FAQs on Total Production Time given Time for Individual Operation and Batch Size

What is the formula to find Total Production Time given Time for Individual Operation and Batch Size?
The formula of Total Production Time given Time for Individual Operation and Batch Size is expressed as Total Production Time = (Batch Size*Setup Time+Batch Size*Machining Time+Number of Tools Used*Time to Change One Tool). Here is an example- 1100 = (2*54+2*46+3*300).
How to calculate Total Production Time given Time for Individual Operation and Batch Size?
With Batch Size (Nb), Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc) we can find Total Production Time given Time for Individual Operation and Batch Size using the formula - Total Production Time = (Batch Size*Setup Time+Batch Size*Machining Time+Number of Tools Used*Time to Change One Tool).
What are the other ways to Calculate Total Production Time?
Here are the different ways to Calculate Total Production Time-
  • Total Production Time=(Total Machining Time+Non Productive Time+Total Tool Changing Time)OpenImg
  • Total Production Time=Total Machining And Operating Cost/Machining And Operating RateOpenImg
Can the Total Production Time given Time for Individual Operation and Batch Size be negative?
No, the Total Production Time given Time for Individual Operation and Batch Size, measured in Time cannot be negative.
Which unit is used to measure Total Production Time given Time for Individual Operation and Batch Size?
Total Production Time given Time for Individual Operation and Batch Size is usually measured using the Second[s] for Time. Millisecond[s], Microsecond[s], Nanosecond[s] are the few other units in which Total Production Time given Time for Individual Operation and Batch Size can be measured.
Copied!