Total Production Time evaluator uses Total Production Time = (Total Machining Time+Non Productive Time+Total Tool Changing Time) to evaluate the Total Production Time, The Total Production Time is defined as the total time it takes to produce a complete batch of components from scratch. Total Production Time is denoted by TPT symbol.
How to evaluate Total Production Time using this online evaluator? To use this online evaluator for Total Production Time, enter Total Machining Time (TMT), Non Productive Time (NPT) & Total Tool Changing Time (TCT) and hit the calculate button.