Fx Copy
LaTeX Copy
Total Production Cost involves summing up various cost components associated with the machining process. Check FAQs
Ctp=N(C(ts+t))+Nt(Ctc+C)
Ctp - Total Production Cost?N - Batch Size?C - Cost of a Tool?ts - Setup Time?t - Machining Time?Nt - Number of Tools Used?tc - Time to Change One Tool?

Total Production Cost Example

With values
With units
Only example

Here is how the Total Production Cost equation looks like with Values.

Here is how the Total Production Cost equation looks like with Units.

Here is how the Total Production Cost equation looks like.

30000Edit=2Edit(80Edit(54Edit+87Edit))+3Edit(80Edit30Edit+80Edit)
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Total Production Cost

Total Production Cost Solution

Follow our step by step solution on how to calculate Total Production Cost?

FIRST Step Consider the formula
Ctp=N(C(ts+t))+Nt(Ctc+C)
Next Step Substitute values of Variables
Ctp=2(80(54s+87s))+3(8030s+80)
Next Step Prepare to Evaluate
Ctp=2(80(54+87))+3(8030+80)
LAST Step Evaluate
Ctp=30000

Total Production Cost Formula Elements

Variables
Total Production Cost
Total Production Cost involves summing up various cost components associated with the machining process.
Symbol: Ctp
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: N
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost of a Tool
Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Symbol: C
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Machining Time
Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Symbol: t
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Time to Change One Tool
Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one.
Symbol: tc
Measurement: TimeUnit: s
Note: Value should be greater than 0.

Other Formulas to find Total Production Cost

​Go Total Production Cost for given Batch Size
Ctp=NCp

Other formulas in Total Production Cost category

​Go Total Non-Productive Cost given Total Production Cost
Tnpc=Ctp-(Cm+Cct+Ct)
​Go Non-Productive Cost of Each Component given Total Production Cost
Cnp=Ctp-(NCt+Nt((Ctc)+C))

How to Evaluate Total Production Cost?

Total Production Cost evaluator uses Total Production Cost = Batch Size*(Cost of a Tool*(Setup Time+Machining Time))+Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool) to evaluate the Total Production Cost, The Total Production Cost is defined as the total cost of producing a batch of components from scratch including all necessary operations and processes. Total Production Cost is denoted by Ctp symbol.

How to evaluate Total Production Cost using this online evaluator? To use this online evaluator for Total Production Cost, enter Batch Size (N), Cost of a Tool (C), Setup Time (ts), Machining Time (t), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button.

FAQs on Total Production Cost

What is the formula to find Total Production Cost?
The formula of Total Production Cost is expressed as Total Production Cost = Batch Size*(Cost of a Tool*(Setup Time+Machining Time))+Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool). Here is an example- 30000 = 2*(80*(54+87))+3*(80*30+80).
How to calculate Total Production Cost?
With Batch Size (N), Cost of a Tool (C), Setup Time (ts), Machining Time (t), Number of Tools Used (Nt) & Time to Change One Tool (tc) we can find Total Production Cost using the formula - Total Production Cost = Batch Size*(Cost of a Tool*(Setup Time+Machining Time))+Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool).
What are the other ways to Calculate Total Production Cost?
Here are the different ways to Calculate Total Production Cost-
  • Total Production Cost=Batch Size*Production Cost of Each ComponentOpenImg
Copied!