Number of Main Bars is the number of reinforcement bars that are placed in the tension zone of the slab to resist the bending moment & to transfer the loads to the supports. Check FAQs
Nomain bars=(Lclear(longer side)Sbar)+1
Nomain bars - Number of Main Bars?Lclear(longer side) - Clear Span of Longer Side?Sbar - Spacing between Bars?

Total Number of Main Bars Example

With values
With units
Only example

Here is how the Total Number of Main Bars equation looks like with Values.

Here is how the Total Number of Main Bars equation looks like with Units.

Here is how the Total Number of Main Bars equation looks like.

41.0067Edit=(6001Edit150Edit)+1
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Estimation and Costing » fx Total Number of Main Bars

Total Number of Main Bars Solution

Follow our step by step solution on how to calculate Total Number of Main Bars?

FIRST Step Consider the formula
Nomain bars=(Lclear(longer side)Sbar)+1
Next Step Substitute values of Variables
Nomain bars=(6001mm150mm)+1
Next Step Convert Units
Nomain bars=(6.001m0.15m)+1
Next Step Prepare to Evaluate
Nomain bars=(6.0010.15)+1
Next Step Evaluate
Nomain bars=41.0066666666667
LAST Step Rounding Answer
Nomain bars=41.0067

Total Number of Main Bars Formula Elements

Variables
Number of Main Bars
Number of Main Bars is the number of reinforcement bars that are placed in the tension zone of the slab to resist the bending moment & to transfer the loads to the supports.
Symbol: Nomain bars
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Clear Span of Longer Side
Clear Span of Longer Side is the clear distance between two support of the longer side of the structural component.
Symbol: Lclear(longer side)
Measurement: LengthUnit: mm
Note: Value should be greater than 0.
Spacing between Bars
Spacing between Bars is the distance between two consecutive bars in the slab.
Symbol: Sbar
Measurement: LengthUnit: mm
Note: Value should be greater than 0.

Other formulas in Bar Bending Schedule for RCC slab category

​Go Total Number of Distribution Bars
Nodistribution bar=(Lclear(short side)Sbar)+1
​Go Cutting Length of Main Bar
Lmain bar=Lclear(short side)+(2Wbeam)-(2Cslab)+(0.42deff)-(2d)
​Go Cutting Length of Distribution Bar
Ldist bars=Lclear(longer side)-(2Cslab)

How to Evaluate Total Number of Main Bars?

Total Number of Main Bars evaluator uses Number of Main Bars = (Clear Span of Longer Side/Spacing between Bars)+1 to evaluate the Number of Main Bars, The Total Number of Main Bars formula is defined as calculating the number of main bars needed for the RCC slab of a given cross-sectional area. Number of Main Bars is denoted by Nomain bars symbol.

How to evaluate Total Number of Main Bars using this online evaluator? To use this online evaluator for Total Number of Main Bars, enter Clear Span of Longer Side (Lclear(longer side)) & Spacing between Bars (Sbar) and hit the calculate button.

FAQs on Total Number of Main Bars

What is the formula to find Total Number of Main Bars?
The formula of Total Number of Main Bars is expressed as Number of Main Bars = (Clear Span of Longer Side/Spacing between Bars)+1. Here is an example- 41 = (6.001/0.15)+1.
How to calculate Total Number of Main Bars?
With Clear Span of Longer Side (Lclear(longer side)) & Spacing between Bars (Sbar) we can find Total Number of Main Bars using the formula - Number of Main Bars = (Clear Span of Longer Side/Spacing between Bars)+1.
Copied!