Fx Copy
LaTeX Copy
Total Number of Leaves is defined as the sum of graduated length leaves and extra full length leaves. Check FAQs
n=2ngnfPPi(3nf+2ng)
n - Total Number of Leaves?ng - Number of Graduated Length Leaves?nf - Number of Full length Leaves?P - Force Applied at End of Leaf Spring?Pi - Pre Load for Leaf Spring?

Total Number of Leaves given Pre-Load Required to Close Gap Example

With values
With units
Only example

Here is how the Total Number of Leaves given Pre-Load Required to Close Gap equation looks like with Values.

Here is how the Total Number of Leaves given Pre-Load Required to Close Gap equation looks like with Units.

Here is how the Total Number of Leaves given Pre-Load Required to Close Gap equation looks like.

18.0288Edit=215Edit3Edit37500Edit4800Edit(33Edit+215Edit)
You are here -
HomeIcon Home » Category Physics » Category Mechanical » Category Design of Automobile Elements » fx Total Number of Leaves given Pre-Load Required to Close Gap

Total Number of Leaves given Pre-Load Required to Close Gap Solution

Follow our step by step solution on how to calculate Total Number of Leaves given Pre-Load Required to Close Gap?

FIRST Step Consider the formula
n=2ngnfPPi(3nf+2ng)
Next Step Substitute values of Variables
n=215337500N4800N(33+215)
Next Step Prepare to Evaluate
n=2153375004800(33+215)
Next Step Evaluate
n=18.0288461538462
LAST Step Rounding Answer
n=18.0288

Total Number of Leaves given Pre-Load Required to Close Gap Formula Elements

Variables
Total Number of Leaves
Total Number of Leaves is defined as the sum of graduated length leaves and extra full length leaves.
Symbol: n
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Number of Graduated Length Leaves
Number of Graduated Length Leaves is defined as the number of graduated-length leaves including master leaf.
Symbol: ng
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Number of Full length Leaves
Number of Full length Leaves is defined as the total number of extra full length leaves present in a multi-leaf spring.
Symbol: nf
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Force Applied at End of Leaf Spring
Force Applied at End of Leaf Spring is defined as the net amount of force that is acting onto the spring.
Symbol: P
Measurement: ForceUnit: N
Note: Value should be greater than 0.
Pre Load for Leaf Spring
Pre load for leaf spring is defined as the force that is required to be maintained between the leaves of a multi-leaf spring to close the gap.
Symbol: Pi
Measurement: ForceUnit: N
Note: Value should be greater than 0.

Other Formulas to find Total Number of Leaves

​Go Total Number of Leaves given Initial Nip of Leaf Spring
n=2PL3ECbt3

Other formulas in Nipping of Leaf Spring category

​Go Initial Nip in Leaf Spring
C=2PL3Enbt3
​Go Force Applied at End of Spring
P=CEnb(t3)2(L3)
​Go Length of Cantilever given Initial Nip of Leaf Spring
L=(CEnbt32P)13
​Go Modulus of Elasticity given Initial Nip of Spring
E=2PL3Cnbt3

How to Evaluate Total Number of Leaves given Pre-Load Required to Close Gap?

Total Number of Leaves given Pre-Load Required to Close Gap evaluator uses Total Number of Leaves = 2*Number of Graduated Length Leaves*Number of Full length Leaves*Force Applied at End of Leaf Spring/(Pre Load for Leaf Spring*(3*Number of Full length Leaves+2*Number of Graduated Length Leaves)) to evaluate the Total Number of Leaves, The Total Number of Leaves given Pre-Load Required to Close Gap formula is defined as the sum of graduated length leaves and extra full length leaves in a multi-leaf spring. Total Number of Leaves is denoted by n symbol.

How to evaluate Total Number of Leaves given Pre-Load Required to Close Gap using this online evaluator? To use this online evaluator for Total Number of Leaves given Pre-Load Required to Close Gap, enter Number of Graduated Length Leaves (ng), Number of Full length Leaves (nf), Force Applied at End of Leaf Spring (P) & Pre Load for Leaf Spring (Pi) and hit the calculate button.

FAQs on Total Number of Leaves given Pre-Load Required to Close Gap

What is the formula to find Total Number of Leaves given Pre-Load Required to Close Gap?
The formula of Total Number of Leaves given Pre-Load Required to Close Gap is expressed as Total Number of Leaves = 2*Number of Graduated Length Leaves*Number of Full length Leaves*Force Applied at End of Leaf Spring/(Pre Load for Leaf Spring*(3*Number of Full length Leaves+2*Number of Graduated Length Leaves)). Here is an example- 18.02885 = 2*15*3*37500/(4800*(3*3+2*15)).
How to calculate Total Number of Leaves given Pre-Load Required to Close Gap?
With Number of Graduated Length Leaves (ng), Number of Full length Leaves (nf), Force Applied at End of Leaf Spring (P) & Pre Load for Leaf Spring (Pi) we can find Total Number of Leaves given Pre-Load Required to Close Gap using the formula - Total Number of Leaves = 2*Number of Graduated Length Leaves*Number of Full length Leaves*Force Applied at End of Leaf Spring/(Pre Load for Leaf Spring*(3*Number of Full length Leaves+2*Number of Graduated Length Leaves)).
What are the other ways to Calculate Total Number of Leaves?
Here are the different ways to Calculate Total Number of Leaves-
  • Total Number of Leaves=2*Force Applied at End of Leaf Spring*Length of Cantilever of Leaf Spring^3/(Modulus of Elasticity of Spring*Nip in Leaf Spring*Width of Leaf*Thickness of Leaf^3)OpenImg
Copied!