Total Non-Productive Time using Average Production Cost Formula

Fx Copy
LaTeX Copy
Non Productive Time refers to the periods during the manufacturing process when the machine or operator is not engaged in active cutting or material removal. Check FAQs
Tnp=Nb(Cpr-Cttm)-(CtNttc)-(NtCt)Ct
Tnp - Non Productive Time?Nb - Batch Size?Cpr - Production Cost of Each Component?Ct - Cost of a Tool?tm - Machining Time?Nt - Number of Tools Used?tc - Time to Change One Tool?

Total Non-Productive Time using Average Production Cost Example

With values
With units
Only example

Here is how the Total Non-Productive Time using Average Production Cost equation looks like with Values.

Here is how the Total Non-Productive Time using Average Production Cost equation looks like with Units.

Here is how the Total Non-Productive Time using Average Production Cost equation looks like.

0.9Edit=2Edit(11400Edit-80Edit1.15Edit)-(80Edit3Edit0.5Edit)-(3Edit80Edit)80Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Total Non-Productive Time using Average Production Cost

Total Non-Productive Time using Average Production Cost Solution

Follow our step by step solution on how to calculate Total Non-Productive Time using Average Production Cost?

FIRST Step Consider the formula
Tnp=Nb(Cpr-Cttm)-(CtNttc)-(NtCt)Ct
Next Step Substitute values of Variables
Tnp=2(11400-801.15min)-(8030.5min)-(380)80
Next Step Convert Units
Tnp=2(11400-8069s)-(80330s)-(380)80
Next Step Prepare to Evaluate
Tnp=2(11400-8069)-(80330)-(380)80
Next Step Evaluate
Tnp=54s
LAST Step Convert to Output's Unit
Tnp=0.9min

Total Non-Productive Time using Average Production Cost Formula Elements

Variables
Non Productive Time
Non Productive Time refers to the periods during the manufacturing process when the machine or operator is not engaged in active cutting or material removal.
Symbol: Tnp
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Production Cost of Each Component
Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Symbol: Cpr
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost of a Tool
Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Symbol: Ct
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Machining Time
Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Symbol: tm
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Time to Change One Tool
Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one.
Symbol: tc
Measurement: TimeUnit: min
Note: Value should be greater than 0.

Other formulas in Average Production Cost category

​Go Number of Tools used given Average Production Cost
Nt=NbCpr-Ct(ts+tm)Cttc+Ct
​Go Number of Tools used given Average Production Time
Nt=Nbtp-(ts+tm)tc

How to Evaluate Total Non-Productive Time using Average Production Cost?

Total Non-Productive Time using Average Production Cost evaluator uses Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool to evaluate the Non Productive Time, The Total Non-Productive Time using Average Production Cost refers to the cumulative duration during which the manufacturing process is not actively producing parts. This includes any downtime, setup time, tool changes, maintenance, and other activities that do not directly contribute to the production of components. Understanding and minimizing non-productive time is essential for optimizing production efficiency and reducing overall manufacturing costs. Non Productive Time is denoted by Tnp symbol.

How to evaluate Total Non-Productive Time using Average Production Cost using this online evaluator? To use this online evaluator for Total Non-Productive Time using Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button.

FAQs on Total Non-Productive Time using Average Production Cost

What is the formula to find Total Non-Productive Time using Average Production Cost?
The formula of Total Non-Productive Time using Average Production Cost is expressed as Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool. Here is an example- 0.015 = (2*(11400-80*69)-(80*3*30)-(3*80))/80.
How to calculate Total Non-Productive Time using Average Production Cost?
With Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc) we can find Total Non-Productive Time using Average Production Cost using the formula - Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of a Tool*Machining Time)-(Cost of a Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of a Tool))/Cost of a Tool.
Can the Total Non-Productive Time using Average Production Cost be negative?
No, the Total Non-Productive Time using Average Production Cost, measured in Time cannot be negative.
Which unit is used to measure Total Non-Productive Time using Average Production Cost?
Total Non-Productive Time using Average Production Cost is usually measured using the Minute[min] for Time. Second[min], Millisecond[min], Microsecond[min] are the few other units in which Total Non-Productive Time using Average Production Cost can be measured.
Copied!