Total Non-Productive Cost given Average Production Cost Formula

Fx Copy
LaTeX Copy
Total Non Productive Cost is the amount spent on activities that do not result in any productivity or profit to the plant during the manufacturing of a batch of components. Check FAQs
Cnp=Nb(Cpr-(Cttm))-(Nt((CtT)+Ct))
Cnp - Total Non Productive Cost?Nb - Batch Size?Cpr - Production Cost of Each Component?Ct - Cost of a Tool?tm - Machining Time?Nt - Number of Tools Used?T - Tool Changing Time?

Total Non-Productive Cost given Average Production Cost Example

With values
With units
Only example

Here is how the Total Non-Productive Cost given Average Production Cost equation looks like with Values.

Here is how the Total Non-Productive Cost given Average Production Cost equation looks like with Units.

Here is how the Total Non-Productive Cost given Average Production Cost equation looks like.

8640Edit=2Edit(11400Edit-(80Edit1.15Edit))-(3Edit((80Edit0.2Edit)+80Edit))
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Total Non-Productive Cost given Average Production Cost

Total Non-Productive Cost given Average Production Cost Solution

Follow our step by step solution on how to calculate Total Non-Productive Cost given Average Production Cost?

FIRST Step Consider the formula
Cnp=Nb(Cpr-(Cttm))-(Nt((CtT)+Ct))
Next Step Substitute values of Variables
Cnp=2(11400-(801.15min))-(3((800.2min)+80))
Next Step Convert Units
Cnp=2(11400-(8069s))-(3((8012s)+80))
Next Step Prepare to Evaluate
Cnp=2(11400-(8069))-(3((8012)+80))
LAST Step Evaluate
Cnp=8640

Total Non-Productive Cost given Average Production Cost Formula Elements

Variables
Total Non Productive Cost
Total Non Productive Cost is the amount spent on activities that do not result in any productivity or profit to the plant during the manufacturing of a batch of components.
Symbol: Cnp
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Production Cost of Each Component
Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Symbol: Cpr
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost of a Tool
Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Symbol: Ct
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Machining Time
Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Symbol: tm
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Tool Changing Time
Tool changing time referred to as tool change time, is the duration required to remove a used tool and replace it with a new one.
Symbol: T
Measurement: TimeUnit: min
Note: Value should be greater than 0.

Other formulas in Average Production Cost category

​Go Number of Tools used given Average Production Cost
Nt=NbCpr-Ct(ts+tm)Cttc+Ct
​Go Number of Tools used given Average Production Time
Nt=Nbtp-(ts+tm)tc

How to Evaluate Total Non-Productive Cost given Average Production Cost?

Total Non-Productive Cost given Average Production Cost evaluator uses Total Non Productive Cost = Batch Size*(Production Cost of Each Component-(Cost of a Tool*Machining Time))-(Number of Tools Used*((Cost of a Tool*Tool Changing Time)+Cost of a Tool)) to evaluate the Total Non Productive Cost, The Total Non-Productive Cost given Average Production Cost refers to the cumulative expenses incurred during periods when machines or resources are not actively engaged in productive activities. These costs arise from various non-value-added activities, such as downtime, setup time, tool changes, maintenance, and administrative tasks. Understanding and minimizing non-productive costs are essential for optimizing manufacturing efficiency and reducing overall production costs. Total Non Productive Cost is denoted by Cnp symbol.

How to evaluate Total Non-Productive Cost given Average Production Cost using this online evaluator? To use this online evaluator for Total Non-Productive Cost given Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Machining Time (tm), Number of Tools Used (Nt) & Tool Changing Time (T) and hit the calculate button.

FAQs on Total Non-Productive Cost given Average Production Cost

What is the formula to find Total Non-Productive Cost given Average Production Cost?
The formula of Total Non-Productive Cost given Average Production Cost is expressed as Total Non Productive Cost = Batch Size*(Production Cost of Each Component-(Cost of a Tool*Machining Time))-(Number of Tools Used*((Cost of a Tool*Tool Changing Time)+Cost of a Tool)). Here is an example- 8640 = 2*(11400-(80*69))-(3*((80*12)+80)).
How to calculate Total Non-Productive Cost given Average Production Cost?
With Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Machining Time (tm), Number of Tools Used (Nt) & Tool Changing Time (T) we can find Total Non-Productive Cost given Average Production Cost using the formula - Total Non Productive Cost = Batch Size*(Production Cost of Each Component-(Cost of a Tool*Machining Time))-(Number of Tools Used*((Cost of a Tool*Tool Changing Time)+Cost of a Tool)).
Copied!