Total Minimum Cost Formula

Fx Copy
LaTeX Copy
Total Minimum Cost is the minimum amount of money required to execute an entire system of machinery. Check FAQs
TMC=(Cmin((TCMC+tcharge)(1NOR-1))NOR)
TMC - Total Minimum Cost?Cmin - Minimum Cost?TC - Tool Cost?MC - Machine Cost?tcharge - Tool Changing Time?NOR - Number of Rotation?

Total Minimum Cost Example

With values
With units
Only example

Here is how the Total Minimum Cost equation looks like with Values.

Here is how the Total Minimum Cost equation looks like with Units.

Here is how the Total Minimum Cost equation looks like.

-811.1756Edit=(1223Edit((200Edit10000Edit+1.7Edit)(13Edit-1))3Edit)
You are here -
HomeIcon Home » Category Engineering » Category Mechanical » Category Manufacturing » fx Total Minimum Cost

Total Minimum Cost Solution

Follow our step by step solution on how to calculate Total Minimum Cost?

FIRST Step Consider the formula
TMC=(Cmin((TCMC+tcharge)(1NOR-1))NOR)
Next Step Substitute values of Variables
TMC=(1223((20010000+1.7s)(13-1))3)
Next Step Prepare to Evaluate
TMC=(1223((20010000+1.7)(13-1))3)
Next Step Evaluate
TMC=-811.175627617694
LAST Step Rounding Answer
TMC=-811.1756

Total Minimum Cost Formula Elements

Variables
Total Minimum Cost
Total Minimum Cost is the minimum amount of money required to execute an entire system of machinery.
Symbol: TMC
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Minimum Cost
Minimum Cost indicates the price associated with the making of the product.
Symbol: Cmin
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Tool Cost
Tool Cost is the amount of money spend on the purchase, maintenance and changing of tools.
Symbol: TC
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Machine Cost
Machine Cost is the amount of money spent on the purchase and maintenance of machinery.
Symbol: MC
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Tool Changing Time
Tool Changing Time is the average time required by the operator or automation system (such as automatic tool changer – ATC) to change the tool.
Symbol: tcharge
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Number of Rotation
Number of Rotation refers to the number of times the machine rotated about a fixed point.
Symbol: NOR
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Metal Cutting category

​Go Shear Angle
ϕ=atan(wcos(θ)1-wsin(θ))
​Go Shear Force
Fs=Fccos(θ)-Ptsin(θ)
​Go Shear Plane Angle
ϕ=arctan(rcos(α)1-rsin(α))
​Go Shear Strain
𝜂=tan(ϕ)+cot(ϕ-α)

How to Evaluate Total Minimum Cost?

Total Minimum Cost evaluator uses Total Minimum Cost = (Minimum Cost/((Tool Cost/Machine Cost+Tool Changing Time)*(1/Number of Rotation-1))^Number of Rotation) to evaluate the Total Minimum Cost, Total Minimum Cost is the minimum amount of money required to execute entire machinery system. Total Minimum Cost is denoted by TMC symbol.

How to evaluate Total Minimum Cost using this online evaluator? To use this online evaluator for Total Minimum Cost, enter Minimum Cost (Cmin), Tool Cost (TC), Machine Cost (MC), Tool Changing Time (tcharge) & Number of Rotation (NOR) and hit the calculate button.

FAQs on Total Minimum Cost

What is the formula to find Total Minimum Cost?
The formula of Total Minimum Cost is expressed as Total Minimum Cost = (Minimum Cost/((Tool Cost/Machine Cost+Tool Changing Time)*(1/Number of Rotation-1))^Number of Rotation). Here is an example- -811.175628 = (1223/((200/10000+1.7)*(1/3-1))^3).
How to calculate Total Minimum Cost?
With Minimum Cost (Cmin), Tool Cost (TC), Machine Cost (MC), Tool Changing Time (tcharge) & Number of Rotation (NOR) we can find Total Minimum Cost using the formula - Total Minimum Cost = (Minimum Cost/((Tool Cost/Machine Cost+Tool Changing Time)*(1/Number of Rotation-1))^Number of Rotation).
Copied!