Tool Positioning Time per Operation given Non-Productive Time in Turning evaluator uses Tool Positioning Time Per Operation = (Non-Productive Time-((Basic Setup Time+Number of Tools Used*Setup Time Per Tool)/Batch Size)-Loading And Unloading Time)/Number of Operations to evaluate the Tool Positioning Time Per Operation, The Tool Positioning Time per Operation given Non-Productive time in turning is defined as the time taken in changing and positioning the tool before the start of operation. Tool Positioning Time Per Operation is denoted by tpt symbol.
How to evaluate Tool Positioning Time per Operation given Non-Productive Time in Turning using this online evaluator? To use this online evaluator for Tool Positioning Time per Operation given Non-Productive Time in Turning, enter Non-Productive Time (NPT), Basic Setup Time (ts), Number of Tools Used (Nt), Setup Time Per Tool (tst), Batch Size (Nb), Loading And Unloading Time (tln) & Number of Operations (n0) and hit the calculate button.