Tool Changing Time for Each Tool given Average Production Cost Formula

Fx Copy
LaTeX Copy
Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one. Check FAQs
tc=Nb(Cpr-Ct(ts+tm))-NtCtCtNt
tc - Time to Change One Tool?Nb - Batch Size?Cpr - Production Cost of Each Component?Ct - Cost of a Tool?ts - Setup Time?tm - Machining Time?Nt - Number of Tools Used?

Tool Changing Time for Each Tool given Average Production Cost Example

With values
With units
Only example

Here is how the Tool Changing Time for Each Tool given Average Production Cost equation looks like with Values.

Here is how the Tool Changing Time for Each Tool given Average Production Cost equation looks like with Units.

Here is how the Tool Changing Time for Each Tool given Average Production Cost equation looks like.

0.5Edit=2Edit(11400Edit-80Edit(0.45Edit+1.15Edit))-3Edit80Edit80Edit3Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Tool Changing Time for Each Tool given Average Production Cost

Tool Changing Time for Each Tool given Average Production Cost Solution

Follow our step by step solution on how to calculate Tool Changing Time for Each Tool given Average Production Cost?

FIRST Step Consider the formula
tc=Nb(Cpr-Ct(ts+tm))-NtCtCtNt
Next Step Substitute values of Variables
tc=2(11400-80(0.45min+1.15min))-380803
Next Step Convert Units
tc=2(11400-80(27s+69s))-380803
Next Step Prepare to Evaluate
tc=2(11400-80(27+69))-380803
Next Step Evaluate
tc=30s
LAST Step Convert to Output's Unit
tc=0.5min

Tool Changing Time for Each Tool given Average Production Cost Formula Elements

Variables
Time to Change One Tool
Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one.
Symbol: tc
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Production Cost of Each Component
Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Symbol: Cpr
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost of a Tool
Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Symbol: Ct
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Machining Time
Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Symbol: tm
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Average Production Cost category

​Go Number of Tools used given Average Production Cost
Nt=NbCpr-Ct(ts+tm)Cttc+Ct
​Go Number of Tools used given Average Production Time
Nt=Nbtp-(ts+tm)tc

How to Evaluate Tool Changing Time for Each Tool given Average Production Cost?

Tool Changing Time for Each Tool given Average Production Cost evaluator uses Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool*Number of Tools Used) to evaluate the Time to Change One Tool, Tool Changing Time for Each Tool given Average Production Cost refers to the duration required to replace a tool in a machine during the manufacturing process. This includes the time taken to stop the machine, remove the old tool, install the new tool, calibrate or set up the machine for the new tool, and perform any necessary quality checks to ensure the machine is ready for production. Time to Change One Tool is denoted by tc symbol.

How to evaluate Tool Changing Time for Each Tool given Average Production Cost using this online evaluator? To use this online evaluator for Tool Changing Time for Each Tool given Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm) & Number of Tools Used (Nt) and hit the calculate button.

FAQs on Tool Changing Time for Each Tool given Average Production Cost

What is the formula to find Tool Changing Time for Each Tool given Average Production Cost?
The formula of Tool Changing Time for Each Tool given Average Production Cost is expressed as Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool*Number of Tools Used). Here is an example- 0.008333 = (2*(11400-80*(27+69))-3*80)/(80*3).
How to calculate Tool Changing Time for Each Tool given Average Production Cost?
With Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm) & Number of Tools Used (Nt) we can find Tool Changing Time for Each Tool given Average Production Cost using the formula - Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of a Tool)/(Cost of a Tool*Number of Tools Used).
Can the Tool Changing Time for Each Tool given Average Production Cost be negative?
No, the Tool Changing Time for Each Tool given Average Production Cost, measured in Time cannot be negative.
Which unit is used to measure Tool Changing Time for Each Tool given Average Production Cost?
Tool Changing Time for Each Tool given Average Production Cost is usually measured using the Minute[min] for Time. Second[min], Millisecond[min], Microsecond[min] are the few other units in which Tool Changing Time for Each Tool given Average Production Cost can be measured.
Copied!