Tool Changing Cost of Each Product using Average Production Cost Formula

Fx Copy
LaTeX Copy
The cost of changing each Tool is the cost that arises due to the time taken by the operator to change one tool when he is paid by the hour. Check FAQs
Cct=NbCpr-NbCt(ts+tm)-NtCtNt
Cct - Cost of Changing Each Tool?Nb - Batch Size?Cpr - Production Cost of Each Component?Ct - Cost of a Tool?ts - Setup Time?tm - Machining Time?Nt - Number of Tools Used?

Tool Changing Cost of Each Product using Average Production Cost Example

With values
With units
Only example

Here is how the Tool Changing Cost of Each Product using Average Production Cost equation looks like with Values.

Here is how the Tool Changing Cost of Each Product using Average Production Cost equation looks like with Units.

Here is how the Tool Changing Cost of Each Product using Average Production Cost equation looks like.

2400Edit=2Edit11400Edit-2Edit80Edit(0.45Edit+1.15Edit)-3Edit80Edit3Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Tool Changing Cost of Each Product using Average Production Cost

Tool Changing Cost of Each Product using Average Production Cost Solution

Follow our step by step solution on how to calculate Tool Changing Cost of Each Product using Average Production Cost?

FIRST Step Consider the formula
Cct=NbCpr-NbCt(ts+tm)-NtCtNt
Next Step Substitute values of Variables
Cct=211400-280(0.45min+1.15min)-3803
Next Step Convert Units
Cct=211400-280(27s+69s)-3803
Next Step Prepare to Evaluate
Cct=211400-280(27+69)-3803
LAST Step Evaluate
Cct=2400

Tool Changing Cost of Each Product using Average Production Cost Formula Elements

Variables
Cost of Changing Each Tool
The cost of changing each Tool is the cost that arises due to the time taken by the operator to change one tool when he is paid by the hour.
Symbol: Cct
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Production Cost of Each Component
Production cost of each component involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Symbol: Cpr
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost of a Tool
Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Symbol: Ct
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Machining Time
Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Symbol: tm
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Average Production Cost category

​Go Number of Tools used given Average Production Cost
Nt=NbCpr-Ct(ts+tm)Cttc+Ct
​Go Number of Tools used given Average Production Time
Nt=Nbtp-(ts+tm)tc

How to Evaluate Tool Changing Cost of Each Product using Average Production Cost?

Tool Changing Cost of Each Product using Average Production Cost evaluator uses Cost of Changing Each Tool = (Batch Size*Production Cost of Each Component-Batch Size*Cost of a Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of a Tool)/(Number of Tools Used) to evaluate the Cost of Changing Each Tool, Tool Changing Cost of Each Product using Average Production Cost refers to the portion of the total production cost that is attributed to the time and resources required to change tools during the manufacturing process. This cost includes the labor, machine downtime, and any associated expenses incurred each time a tool is changed. Cost of Changing Each Tool is denoted by Cct symbol.

How to evaluate Tool Changing Cost of Each Product using Average Production Cost using this online evaluator? To use this online evaluator for Tool Changing Cost of Each Product using Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm) & Number of Tools Used (Nt) and hit the calculate button.

FAQs on Tool Changing Cost of Each Product using Average Production Cost

What is the formula to find Tool Changing Cost of Each Product using Average Production Cost?
The formula of Tool Changing Cost of Each Product using Average Production Cost is expressed as Cost of Changing Each Tool = (Batch Size*Production Cost of Each Component-Batch Size*Cost of a Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of a Tool)/(Number of Tools Used). Here is an example- 2400 = (2*11400-2*80*(27+69)-3*80)/(3).
How to calculate Tool Changing Cost of Each Product using Average Production Cost?
With Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm) & Number of Tools Used (Nt) we can find Tool Changing Cost of Each Product using Average Production Cost using the formula - Cost of Changing Each Tool = (Batch Size*Production Cost of Each Component-Batch Size*Cost of a Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of a Tool)/(Number of Tools Used).
Copied!