Thickness of Lift given Compaction Production by Compaction Equipment evaluator uses Lift Thickness = (Production due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Efficiency Factor*Pay Ratio) to evaluate the Lift Thickness, The Thickness of Lift given Compaction Production by Compaction Equipment formula is defined as the vertical thickness of soil or aggregate layers (known as lifts) that are compacted using specific compaction equipment, such as rollers or compactors. This thickness is crucial because it determines the effectiveness of compaction in achieving the desired density and strength of the soil or aggregate material. Lift Thickness is denoted by L symbol.
How to evaluate Thickness of Lift given Compaction Production by Compaction Equipment using this online evaluator? To use this online evaluator for Thickness of Lift given Compaction Production by Compaction Equipment, enter Production due to Compaction (y), Number of Passes (P), Width of Roller (W), Roller Speed (S), Efficiency Factor (E) & Pay Ratio (PR) and hit the calculate button.