Standard Effective Duration given Modified Basin Lag evaluator uses Standard Duration of Effective Rainfall = -(4*(Modified Basin Lag-Basin Lag)-Non-standard rainfall duration) to evaluate the Standard Duration of Effective Rainfall, The Standard Effective Duration given Modified Basin Lag formula is defined as the time interval of precipitation to be equal to the difference between total rainfall and actual evapotranspiration. Standard Duration of Effective Rainfall is denoted by tr symbol.
How to evaluate Standard Effective Duration given Modified Basin Lag using this online evaluator? To use this online evaluator for Standard Effective Duration given Modified Basin Lag, enter Modified Basin Lag (t'p), Basin Lag (tp) & Non-standard rainfall duration (tR) and hit the calculate button.