Fx Copy
LaTeX Copy
Batch Size is the count of similar kinds of products to be manufactured. Check FAQs
Nb=NPTts
Nb - Batch Size?NPT - Non Productive Time?ts - Setup Time?

Size of Batch using Total Non-Productive Time Example

With values
With units
Only example

Here is how the Size of Batch using Total Non-Productive Time equation looks like with Values.

Here is how the Size of Batch using Total Non-Productive Time equation looks like with Units.

Here is how the Size of Batch using Total Non-Productive Time equation looks like.

2Edit=108Edit54Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Size of Batch using Total Non-Productive Time

Size of Batch using Total Non-Productive Time Solution

Follow our step by step solution on how to calculate Size of Batch using Total Non-Productive Time?

FIRST Step Consider the formula
Nb=NPTts
Next Step Substitute values of Variables
Nb=108s54s
Next Step Prepare to Evaluate
Nb=10854
LAST Step Evaluate
Nb=2

Size of Batch using Total Non-Productive Time Formula Elements

Variables
Batch Size
Batch Size is the count of similar kinds of products to be manufactured.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Non Productive Time
Non Productive Time is the total time wasted in setting up the machine or workpiece for a particular process.
Symbol: NPT
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: s
Note: Value should be greater than 0.

Other Formulas to find Batch Size

​Go Size of Batch given Total Machining Time
Nb=TMTtm

Other formulas in Total Production Time category

​Go Total Non-Productive Time
NPT=Nbts
​Go Load or Unload or Setup Time given Total Non-Productive Time
ts=NPTNb
​Go Total Machining Time or Total Machine Time
TMT=Nbtm
​Go Machining Time for one Component using Total Machining Time
tm=TMTNb

How to Evaluate Size of Batch using Total Non-Productive Time?

Size of Batch using Total Non-Productive Time evaluator uses Batch Size = Non Productive Time/Setup Time to evaluate the Batch Size, The Size of Batch using Total Non-Productive Time is a method to determine the maximum production capacity of a plant when the total time of wastage is known. Batch Size is denoted by Nb symbol.

How to evaluate Size of Batch using Total Non-Productive Time using this online evaluator? To use this online evaluator for Size of Batch using Total Non-Productive Time, enter Non Productive Time (NPT) & Setup Time (ts) and hit the calculate button.

FAQs on Size of Batch using Total Non-Productive Time

What is the formula to find Size of Batch using Total Non-Productive Time?
The formula of Size of Batch using Total Non-Productive Time is expressed as Batch Size = Non Productive Time/Setup Time. Here is an example- 22.22222 = 108/54.
How to calculate Size of Batch using Total Non-Productive Time?
With Non Productive Time (NPT) & Setup Time (ts) we can find Size of Batch using Total Non-Productive Time using the formula - Batch Size = Non Productive Time/Setup Time.
What are the other ways to Calculate Batch Size?
Here are the different ways to Calculate Batch Size-
  • Batch Size=Total Machining Time/Machining TimeOpenImg
Copied!