Shell-moulded Ductile Iron (vertical pouring) evaluator uses Pouring Time = Empirical Constant 1*sqrt(Mass of Casting) to evaluate the Pouring Time, Shell-moulded Ductile Iron (vertical pouring) provides an estimate of the pouring time required for casting shell-molded ductile iron castings using vertical pouring, based on the mass of the casting. Pouring Time is denoted by tpt symbol.
How to evaluate Shell-moulded Ductile Iron (vertical pouring) using this online evaluator? To use this online evaluator for Shell-moulded Ductile Iron (vertical pouring), enter Empirical Constant 1 (K1) & Mass of Casting (W) and hit the calculate button.