Sewage Discharge given Oxygen Demand and Ultimate BOD Both Formula

Fx Copy
LaTeX Copy
Sewage Discharge given Oxygen Demand is a measure used to determine the volume of sewage that can be discharged based on its oxygen demand and the ultimate Biochemical Oxygen Demand (BOD). Check FAQs
Qod=((BOD5BODu)(Or+(DO2QwXR))Qi-Q)
Qod - Sewage Discharge given Oxygen Demand?BOD5 - 5 Days BOD?BODu - Ultimate BOD?Or - Oxygen Required?DO2 - Oxygen Demand of Biomass?Qw - Volume of Wasted Sludge per day?XR - MLSS in Returned or Wasted Sludge?Qi - Influent BOD?Q - Effluent BOD?

Sewage Discharge given Oxygen Demand and Ultimate BOD Both Example

With values
With units
Only example

Here is how the Sewage Discharge given Oxygen Demand and Ultimate BOD Both equation looks like with Values.

Here is how the Sewage Discharge given Oxygen Demand and Ultimate BOD Both equation looks like with Units.

Here is how the Sewage Discharge given Oxygen Demand and Ultimate BOD Both equation looks like.

1.4273Edit=((1.36Edit2Edit)(0.16Edit+(2.02Edit9.5Edit1.4Edit))13.2Edit-0.4Edit)
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Environmental Engineering » fx Sewage Discharge given Oxygen Demand and Ultimate BOD Both

Sewage Discharge given Oxygen Demand and Ultimate BOD Both Solution

Follow our step by step solution on how to calculate Sewage Discharge given Oxygen Demand and Ultimate BOD Both?

FIRST Step Consider the formula
Qod=((BOD5BODu)(Or+(DO2QwXR))Qi-Q)
Next Step Substitute values of Variables
Qod=((1.36mg/L2mg/L)(0.16mg/d+(2.029.5m³/s1.4mg/L))13.2mg/L-0.4mg/L)
Next Step Convert Units
Qod=((0.0014kg/m³0.002kg/m³)(1.9E-12kg/s+(2.029.5m³/s0.0014kg/m³))0.0132kg/m³-0.0004kg/m³)
Next Step Prepare to Evaluate
Qod=((0.00140.002)(1.9E-12+(2.029.50.0014))0.0132-0.0004)
Next Step Evaluate
Qod=1.42725625009838m³/s
LAST Step Rounding Answer
Qod=1.4273m³/s

Sewage Discharge given Oxygen Demand and Ultimate BOD Both Formula Elements

Variables
Sewage Discharge given Oxygen Demand
Sewage Discharge given Oxygen Demand is a measure used to determine the volume of sewage that can be discharged based on its oxygen demand and the ultimate Biochemical Oxygen Demand (BOD).
Symbol: Qod
Measurement: Volumetric Flow RateUnit: m³/s
Note: Value should be greater than 0.
5 Days BOD
5 Days BOD is an indicator of how much oxygen is utilized by a natural water sample in five days at 20 degrees C.
Symbol: BOD5
Measurement: DensityUnit: mg/L
Note: Value should be greater than 0.
Ultimate BOD
Ultimate BOD is the amount of oxygen required to decompose all of the organic material after infinite time.
Symbol: BODu
Measurement: DensityUnit: mg/L
Note: Value should be greater than 0.
Oxygen Required
Oxygen Required is the amount of oxygen needed to sustain biological processes in an aeration tank, which is a critical component of wastewater treatment systems.
Symbol: Or
Measurement: Mass Flow RateUnit: mg/d
Note: Value should be greater than 0.
Oxygen Demand of Biomass
Oxygen Demand of Biomass is the amount of oxygen required by the microorganisms to decompose organic matter present in biomass.
Symbol: DO2
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Volume of Wasted Sludge per day
Volume of Wasted Sludge per day is the amount of sludge that is removed or wasted from a wastewater treatment process on a daily basis.
Symbol: Qw
Measurement: Volumetric Flow RateUnit: m³/s
Note: Value should be greater than 0.
MLSS in Returned or Wasted Sludge
MLSS in Returned or Wasted Sludge is the mixed liquor suspended solids in returned sludge in terms of mg per liter.
Symbol: XR
Measurement: DensityUnit: mg/L
Note: Value should be greater than 0.
Influent BOD
Influent BOD is the total amount of BOD which is present in the incoming sewage.
Symbol: Qi
Measurement: DensityUnit: mg/L
Note: Value should be greater than 0.
Effluent BOD
Effluent BOD is the amount of BOD present in the outing sewage.
Symbol: Q
Measurement: DensityUnit: mg/L
Note: Value should be greater than 0.

Other formulas in Sewage Discharge category

​Go Sewage Discharge given Oxygen Required in Aeration Tank
Qoxy=(f(O2+(1.42QwXR))Qi-Q)
​Go Sewage Discharge given Oxygen Demand of Biomass
Qsb=(f(O2+(DO2QwXR))Qi-Q)

How to Evaluate Sewage Discharge given Oxygen Demand and Ultimate BOD Both?

Sewage Discharge given Oxygen Demand and Ultimate BOD Both evaluator uses Sewage Discharge given Oxygen Demand = (((5 Days BOD/Ultimate BOD)*(Oxygen Required+(Oxygen Demand of Biomass*Volume of Wasted Sludge per day*MLSS in Returned or Wasted Sludge)))/(Influent BOD-Effluent BOD)) to evaluate the Sewage Discharge given Oxygen Demand, The Sewage Discharge given Oxygen Demand and Ultimate BOD Both formula is defined as the calculation of sewage discharge when we have prior information of oxygen demand and ultimate BOD both. Sewage Discharge given Oxygen Demand is denoted by Qod symbol.

How to evaluate Sewage Discharge given Oxygen Demand and Ultimate BOD Both using this online evaluator? To use this online evaluator for Sewage Discharge given Oxygen Demand and Ultimate BOD Both, enter 5 Days BOD (BOD5), Ultimate BOD (BODu), Oxygen Required (Or), Oxygen Demand of Biomass (DO2), Volume of Wasted Sludge per day (Qw), MLSS in Returned or Wasted Sludge (XR), Influent BOD (Qi) & Effluent BOD (Q) and hit the calculate button.

FAQs on Sewage Discharge given Oxygen Demand and Ultimate BOD Both

What is the formula to find Sewage Discharge given Oxygen Demand and Ultimate BOD Both?
The formula of Sewage Discharge given Oxygen Demand and Ultimate BOD Both is expressed as Sewage Discharge given Oxygen Demand = (((5 Days BOD/Ultimate BOD)*(Oxygen Required+(Oxygen Demand of Biomass*Volume of Wasted Sludge per day*MLSS in Returned or Wasted Sludge)))/(Influent BOD-Effluent BOD)). Here is an example- 1.427256 = (((0.00136/0.002)*(1.85185185185185E-12+(2.02*9.5*0.0014)))/(0.0132-0.0004)).
How to calculate Sewage Discharge given Oxygen Demand and Ultimate BOD Both?
With 5 Days BOD (BOD5), Ultimate BOD (BODu), Oxygen Required (Or), Oxygen Demand of Biomass (DO2), Volume of Wasted Sludge per day (Qw), MLSS in Returned or Wasted Sludge (XR), Influent BOD (Qi) & Effluent BOD (Q) we can find Sewage Discharge given Oxygen Demand and Ultimate BOD Both using the formula - Sewage Discharge given Oxygen Demand = (((5 Days BOD/Ultimate BOD)*(Oxygen Required+(Oxygen Demand of Biomass*Volume of Wasted Sludge per day*MLSS in Returned or Wasted Sludge)))/(Influent BOD-Effluent BOD)).
Can the Sewage Discharge given Oxygen Demand and Ultimate BOD Both be negative?
No, the Sewage Discharge given Oxygen Demand and Ultimate BOD Both, measured in Volumetric Flow Rate cannot be negative.
Which unit is used to measure Sewage Discharge given Oxygen Demand and Ultimate BOD Both?
Sewage Discharge given Oxygen Demand and Ultimate BOD Both is usually measured using the Cubic Meter per Second[m³/s] for Volumetric Flow Rate. Cubic Meter per Day[m³/s], Cubic Meter per Hour[m³/s], Cubic Meter per Minute[m³/s] are the few other units in which Sewage Discharge given Oxygen Demand and Ultimate BOD Both can be measured.