Setup Time for Each Product given Total Production Cost evaluator uses Setup Time = (Total Production Cost-Cost of a Tool*Batch Size*Machining Time-Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/(Cost of a Tool*Batch Size) to evaluate the Setup Time, The Setup Time for Each Product given Total Production Cost is a method to determine the maximum time that can be spent to load/unload the workpiece and reposition the tool for the manufacturing of a single product based on the total production cost. Setup Time is denoted by ts symbol.
How to evaluate Setup Time for Each Product given Total Production Cost using this online evaluator? To use this online evaluator for Setup Time for Each Product given Total Production Cost, enter Total Production Cost (Ctp), Cost of a Tool (C), Batch Size (N), Machining Time (t), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button.