Setup Time for Each Product given Total Production Cost Formula

Fx Copy
LaTeX Copy
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component. Check FAQs
ts=Ctp-CNt-Nt(Ctc+C)CN
ts - Setup Time?Ctp - Total Production Cost?C - Cost of a Tool?N - Batch Size?t - Machining Time?Nt - Number of Tools Used?tc - Time to Change One Tool?

Setup Time for Each Product given Total Production Cost Example

With values
With units
Only example

Here is how the Setup Time for Each Product given Total Production Cost equation looks like with Values.

Here is how the Setup Time for Each Product given Total Production Cost equation looks like with Units.

Here is how the Setup Time for Each Product given Total Production Cost equation looks like.

54Edit=30000Edit-80Edit2Edit87Edit-3Edit(80Edit30Edit+80Edit)80Edit2Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Setup Time for Each Product given Total Production Cost

Setup Time for Each Product given Total Production Cost Solution

Follow our step by step solution on how to calculate Setup Time for Each Product given Total Production Cost?

FIRST Step Consider the formula
ts=Ctp-CNt-Nt(Ctc+C)CN
Next Step Substitute values of Variables
ts=30000-80287s-3(8030s+80)802
Next Step Prepare to Evaluate
ts=30000-80287-3(8030+80)802
LAST Step Evaluate
ts=54s

Setup Time for Each Product given Total Production Cost Formula Elements

Variables
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Total Production Cost
Total Production Cost involves summing up various cost components associated with the machining process.
Symbol: Ctp
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost of a Tool
Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Symbol: C
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: N
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Machining Time
Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Symbol: t
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Time to Change One Tool
Time to change one tool often referred to as tool change time, includes the duration taken to remove the used tool and install a new one.
Symbol: tc
Measurement: TimeUnit: s
Note: Value should be greater than 0.

Other formulas in Total Production Cost category

​Go Total Production Cost for given Batch Size
Ctp=NCp
​Go Total Production Cost
Ctp=N(C(ts+t))+Nt(Ctc+C)

How to Evaluate Setup Time for Each Product given Total Production Cost?

Setup Time for Each Product given Total Production Cost evaluator uses Setup Time = (Total Production Cost-Cost of a Tool*Batch Size*Machining Time-Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/(Cost of a Tool*Batch Size) to evaluate the Setup Time, The Setup Time for Each Product given Total Production Cost is a method to determine the maximum time that can be spent to load/unload the workpiece and reposition the tool for the manufacturing of a single product based on the total production cost. Setup Time is denoted by ts symbol.

How to evaluate Setup Time for Each Product given Total Production Cost using this online evaluator? To use this online evaluator for Setup Time for Each Product given Total Production Cost, enter Total Production Cost (Ctp), Cost of a Tool (C), Batch Size (N), Machining Time (t), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button.

FAQs on Setup Time for Each Product given Total Production Cost

What is the formula to find Setup Time for Each Product given Total Production Cost?
The formula of Setup Time for Each Product given Total Production Cost is expressed as Setup Time = (Total Production Cost-Cost of a Tool*Batch Size*Machining Time-Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/(Cost of a Tool*Batch Size). Here is an example- 54 = (30000-80*2*87-3*(80*30+80))/(80*2).
How to calculate Setup Time for Each Product given Total Production Cost?
With Total Production Cost (Ctp), Cost of a Tool (C), Batch Size (N), Machining Time (t), Number of Tools Used (Nt) & Time to Change One Tool (tc) we can find Setup Time for Each Product given Total Production Cost using the formula - Setup Time = (Total Production Cost-Cost of a Tool*Batch Size*Machining Time-Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool))/(Cost of a Tool*Batch Size).
Can the Setup Time for Each Product given Total Production Cost be negative?
No, the Setup Time for Each Product given Total Production Cost, measured in Time cannot be negative.
Which unit is used to measure Setup Time for Each Product given Total Production Cost?
Setup Time for Each Product given Total Production Cost is usually measured using the Second[s] for Time. Millisecond[s], Microsecond[s], Nanosecond[s] are the few other units in which Setup Time for Each Product given Total Production Cost can be measured.