Set-up Time per Tool Terms of Non-Productive Time in Turning Formula

Fx Copy
LaTeX Copy
Setup Time Per Tool is defined as the amount of time taken in setting up the tool while machining. Check FAQs
tst=(NPT-tln-(tptn0))Nb-tsNt
tst - Setup Time Per Tool?NPT - Non-Productive Time?tln - Loading And Unloading Time?tpt - Tool Positioning Time Per Operation?n0 - Number of Operations?Nb - Batch Size?ts - Basic Setup Time?Nt - Number of Tools Used?

Set-up Time per Tool Terms of Non-Productive Time in Turning Example

With values
With units
Only example

Here is how the Set-up Time per Tool Terms of Non-Productive Time in Turning equation looks like with Values.

Here is how the Set-up Time per Tool Terms of Non-Productive Time in Turning equation looks like with Units.

Here is how the Set-up Time per Tool Terms of Non-Productive Time in Turning equation looks like.

10.0018Edit=(28.169Edit-30Edit-(1.5Edit5Edit))3Edit-20.5Edit4Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Set-up Time per Tool Terms of Non-Productive Time in Turning

Set-up Time per Tool Terms of Non-Productive Time in Turning Solution

Follow our step by step solution on how to calculate Set-up Time per Tool Terms of Non-Productive Time in Turning?

FIRST Step Consider the formula
tst=(NPT-tln-(tptn0))Nb-tsNt
Next Step Substitute values of Variables
tst=(28.169min-30s-(1.5min5))3-20.5min4
Next Step Convert Units
tst=(1690.14s-30s-(90s5))3-1230s4
Next Step Prepare to Evaluate
tst=(1690.14-30-(905))3-12304
Next Step Evaluate
tst=600.105s
Next Step Convert to Output's Unit
tst=10.00175min
LAST Step Rounding Answer
tst=10.0018min

Set-up Time per Tool Terms of Non-Productive Time in Turning Formula Elements

Variables
Setup Time Per Tool
Setup Time Per Tool is defined as the amount of time taken in setting up the tool while machining.
Symbol: tst
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Non-Productive Time
Non-Productive Time (NPT) refers to the time during which a machine is not actively engaged in producing parts.
Symbol: NPT
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Loading And Unloading Time
Loading And Unloading Time is the time required to load/unload the workpiece before the start of machine operation.
Symbol: tln
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Tool Positioning Time Per Operation
Tool Positioning Time Per Operation is defined as the time taken in changing the tool before the start of operation.
Symbol: tpt
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Number of Operations
The Number of Operations is defined as the total number of operations done in a batch.
Symbol: n0
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Batch Size
Batch Size is the count of similar kinds of products to be manufactured.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Basic Setup Time
Basic Setup Time is the basic time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Turning Operation category

​Go Diameter of Workpiece given Constant for Cylindrical Turning
d=KfπLcut
​Go Turning Length given Constant for Cylindrical Turning
Lcut=Kfπd

How to Evaluate Set-up Time per Tool Terms of Non-Productive Time in Turning?

Set-up Time per Tool Terms of Non-Productive Time in Turning evaluator uses Setup Time Per Tool = ((Non-Productive Time-Loading And Unloading Time-(Tool Positioning Time Per Operation*Number of Operations))*Batch Size-Basic Setup Time)/Number of Tools Used to evaluate the Setup Time Per Tool, The Set-up Time per tool terms of Non-productive time in turning is defined as the amount of time taken in setting up the tool while machining. Setup Time Per Tool is denoted by tst symbol.

How to evaluate Set-up Time per Tool Terms of Non-Productive Time in Turning using this online evaluator? To use this online evaluator for Set-up Time per Tool Terms of Non-Productive Time in Turning, enter Non-Productive Time (NPT), Loading And Unloading Time (tln), Tool Positioning Time Per Operation (tpt), Number of Operations (n0), Batch Size (Nb), Basic Setup Time (ts) & Number of Tools Used (Nt) and hit the calculate button.

FAQs on Set-up Time per Tool Terms of Non-Productive Time in Turning

What is the formula to find Set-up Time per Tool Terms of Non-Productive Time in Turning?
The formula of Set-up Time per Tool Terms of Non-Productive Time in Turning is expressed as Setup Time Per Tool = ((Non-Productive Time-Loading And Unloading Time-(Tool Positioning Time Per Operation*Number of Operations))*Batch Size-Basic Setup Time)/Number of Tools Used. Here is an example- 0.166696 = ((1690.14-30-(90*5))*3-1230)/4.
How to calculate Set-up Time per Tool Terms of Non-Productive Time in Turning?
With Non-Productive Time (NPT), Loading And Unloading Time (tln), Tool Positioning Time Per Operation (tpt), Number of Operations (n0), Batch Size (Nb), Basic Setup Time (ts) & Number of Tools Used (Nt) we can find Set-up Time per Tool Terms of Non-Productive Time in Turning using the formula - Setup Time Per Tool = ((Non-Productive Time-Loading And Unloading Time-(Tool Positioning Time Per Operation*Number of Operations))*Batch Size-Basic Setup Time)/Number of Tools Used.
Can the Set-up Time per Tool Terms of Non-Productive Time in Turning be negative?
No, the Set-up Time per Tool Terms of Non-Productive Time in Turning, measured in Time cannot be negative.
Which unit is used to measure Set-up Time per Tool Terms of Non-Productive Time in Turning?
Set-up Time per Tool Terms of Non-Productive Time in Turning is usually measured using the Minute[min] for Time. Second[min], Millisecond[min], Microsecond[min] are the few other units in which Set-up Time per Tool Terms of Non-Productive Time in Turning can be measured.