RMS Voltage using Load Current (1-Phase 2-Wire Mid-Point Earthed) evaluator uses Root Mean Square Voltage = Power Transmitted/(Current Underground AC*cos(Phase Difference)) to evaluate the Root Mean Square Voltage, The RMS Voltage using Load Current (1-phase 2-wire Mid-point Earthed) formula is defined as the square root of the time average of the voltage squared. Root Mean Square Voltage is denoted by Vrms symbol.
How to evaluate RMS Voltage using Load Current (1-Phase 2-Wire Mid-Point Earthed) using this online evaluator? To use this online evaluator for RMS Voltage using Load Current (1-Phase 2-Wire Mid-Point Earthed), enter Power Transmitted (P), Current Underground AC (I) & Phase Difference (Φ) and hit the calculate button.