Fx Copy
LaTeX Copy
Relative Cost is the cost of a good or service in relation to the prices of other goods and services. Check FAQs
C2/C1=(Fy1Fy2)(P2P1)
C2/C1 - Relative Cost?Fy1 - Yield Stress 1?Fy2 - Yield Stress 2?P2 - Material Cost p2?P1 - Material Cost p1?

Relative Material Cost Ratio Example

With values
With units
Only example

Here is how the Relative Material Cost Ratio equation looks like with Values.

Here is how the Relative Material Cost Ratio equation looks like with Units.

Here is how the Relative Material Cost Ratio equation looks like.

0.8Edit=(104Edit125Edit)(25Edit26Edit)
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Design of Steel Structures » fx Relative Material Cost Ratio

Relative Material Cost Ratio Solution

Follow our step by step solution on how to calculate Relative Material Cost Ratio?

FIRST Step Consider the formula
C2/C1=(Fy1Fy2)(P2P1)
Next Step Substitute values of Variables
C2/C1=(104N/m²125N/m²)(2526)
Next Step Convert Units
C2/C1=(104Pa125Pa)(2526)
Next Step Prepare to Evaluate
C2/C1=(104125)(2526)
LAST Step Evaluate
C2/C1=0.8

Relative Material Cost Ratio Formula Elements

Variables
Relative Cost
Relative Cost is the cost of a good or service in relation to the prices of other goods and services.
Symbol: C2/C1
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Yield Stress 1
Yield Stress 1 is a crucial material property that marks the transition from elastic behavior to plastic behavior.
Symbol: Fy1
Measurement: PressureUnit: N/m²
Note: Value can be positive or negative.
Yield Stress 2
Yield Stress 2 is a crucial material property that marks the transition from elastic behavior to plastic behavior.
Symbol: Fy2
Measurement: PressureUnit: N/m²
Note: Value can be positive or negative.
Material Cost p2
Material Cost p2 is the material price per unit weight. It is the cost of materials used to manufacture a product or provide a service.
Symbol: P2
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Material Cost p1
Material Cost p1 is the material price per unit weight. It is the cost of materials used to manufacture a product or provide a service.
Symbol: P1
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.

Other Formulas to find Relative Cost

​Go Material Cost Ratio
C2/C1=(A2A1)(P2P1)
​Go Relative Cost given Yield Stress
C2/C1=(P2P1)(Fy1Fy2)23
​Go Relative Cost for Designing Fabricated Plate Girders
C2/C1=(P2P1)(Fy1Fy2)12

Other formulas in Economical Structural Steel category

​Go Cross-Sectional Area1 given Material Cost Ratio
A1=A2P2C2/C1P1
​Go Cross-Sectional Area2 given Material Cost Ratio
A2=C2/C1A1P1P2
​Go Material Price p1 given Material Cost Ratio
P1=A2P2C2/C1A1
​Go Material Price p2 given Material Cost Ratio
P2=C2/C1P1A1A2

How to Evaluate Relative Material Cost Ratio?

Relative Material Cost Ratio evaluator uses Relative Cost = (Yield Stress 1/Yield Stress 2)*(Material Cost p2/Material Cost p1) to evaluate the Relative Cost, The Relative Material Cost Ratio formula is defined as the relative material cost when members are designed to carry the same load at a stress that is a fixed percentage of the yield point, then cross-sectional areas are inversely proportional to the yield stresses. Relative Cost is denoted by C2/C1 symbol.

How to evaluate Relative Material Cost Ratio using this online evaluator? To use this online evaluator for Relative Material Cost Ratio, enter Yield Stress 1 (Fy1), Yield Stress 2 (Fy2), Material Cost p2 (P2) & Material Cost p1 (P1) and hit the calculate button.

FAQs on Relative Material Cost Ratio

What is the formula to find Relative Material Cost Ratio?
The formula of Relative Material Cost Ratio is expressed as Relative Cost = (Yield Stress 1/Yield Stress 2)*(Material Cost p2/Material Cost p1). Here is an example- 0.8 = (104/125)*(25/26).
How to calculate Relative Material Cost Ratio?
With Yield Stress 1 (Fy1), Yield Stress 2 (Fy2), Material Cost p2 (P2) & Material Cost p1 (P1) we can find Relative Material Cost Ratio using the formula - Relative Cost = (Yield Stress 1/Yield Stress 2)*(Material Cost p2/Material Cost p1).
What are the other ways to Calculate Relative Cost?
Here are the different ways to Calculate Relative Cost-
  • Relative Cost=(Cross-Sectional Area of Material 2/Cross-Sectional Area of Material 1)*(Material Cost p2/Material Cost p1)OpenImg
  • Relative Cost=(Material Cost p2/Material Cost p1)*(Yield Stress 1/Yield Stress 2)^(2/3)OpenImg
  • Relative Cost=(Material Cost p2/Material Cost p1)*(Yield Stress 1/Yield Stress 2)^(1/2)OpenImg
Copied!