Raw Sludge Added Per Day given Digestion is Parabolic Formula

Fx Copy
LaTeX Copy
Raw Sludge Added Per Day is the quantity of untreated or minimally processed sludge that is introduced into a treatment process or facility daily. Check FAQs
V1'=(3Vt)+(2V2)
V1' - Raw Sludge Added Per Day?V - Volume of Digester?t - Digestion Period?V2 - Equivalent Digested Sludge?

Raw Sludge Added Per Day given Digestion is Parabolic Example

With values
With units
Only example

Here is how the Raw Sludge Added Per Day given Digestion is Parabolic equation looks like with Values.

Here is how the Raw Sludge Added Per Day given Digestion is Parabolic equation looks like with Units.

Here is how the Raw Sludge Added Per Day given Digestion is Parabolic equation looks like.

15.98Edit=(320Edit5Edit)+(21.99Edit)
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Environmental Engineering » fx Raw Sludge Added Per Day given Digestion is Parabolic

Raw Sludge Added Per Day given Digestion is Parabolic Solution

Follow our step by step solution on how to calculate Raw Sludge Added Per Day given Digestion is Parabolic?

FIRST Step Consider the formula
V1'=(3Vt)+(2V2)
Next Step Substitute values of Variables
V1'=(3205s)+(21.99m³/d)
Next Step Prepare to Evaluate
V1'=(3205)+(21.99)
Next Step Evaluate
V1'=0.000184953703703704m³/s
LAST Step Convert to Output's Unit
V1'=15.98m³/d

Raw Sludge Added Per Day given Digestion is Parabolic Formula Elements

Variables
Raw Sludge Added Per Day
Raw Sludge Added Per Day is the quantity of untreated or minimally processed sludge that is introduced into a treatment process or facility daily.
Symbol: V1'
Measurement: Volumetric Flow RateUnit: m³/d
Note: Value should be greater than 0.
Volume of Digester
Volume of Digester is defined as the total capacity of the digester.
Symbol: V
Measurement: VolumeUnit:
Note: Value should be greater than 0.
Digestion Period
Digestion Period is the time required to complete the digestion.
Symbol: t
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Equivalent Digested Sludge
Equivalent Digested Sludge is the volume of sludge produced per day.
Symbol: V2
Measurement: Volumetric Flow RateUnit: m³/d
Note: Value should be greater than 0.

Other formulas in Sludge Digestion Tank or Digesters category

​Go Volume of Digester
V=(V1+V22)T
​Go Volume of Digester given Number of Days for which Digested Sludge is Stored
V=((V1+V22)t)+(V2T)
​Go Number of Days for which Digested Sludge is Stored
T=V-((V1+V22)t)V2
​Go Equivalent Digested Sludge Produced Per Day given Digestion Period
V2=V-(V1t2)(0.5t)+T

How to Evaluate Raw Sludge Added Per Day given Digestion is Parabolic?

Raw Sludge Added Per Day given Digestion is Parabolic evaluator uses Raw Sludge Added Per Day = ((3*Volume of Digester)/Digestion Period)+(2*Equivalent Digested Sludge) to evaluate the Raw Sludge Added Per Day, The Raw Sludge Added Per Day given Digestion is Parabolic formula is defined as the calculation of raw sludge when we have given digestion is parabolic. Raw Sludge Added Per Day is denoted by V1' symbol.

How to evaluate Raw Sludge Added Per Day given Digestion is Parabolic using this online evaluator? To use this online evaluator for Raw Sludge Added Per Day given Digestion is Parabolic, enter Volume of Digester (V), Digestion Period (t) & Equivalent Digested Sludge (V2) and hit the calculate button.

FAQs on Raw Sludge Added Per Day given Digestion is Parabolic

What is the formula to find Raw Sludge Added Per Day given Digestion is Parabolic?
The formula of Raw Sludge Added Per Day given Digestion is Parabolic is expressed as Raw Sludge Added Per Day = ((3*Volume of Digester)/Digestion Period)+(2*Equivalent Digested Sludge). Here is an example- 1.4E+6 = ((3*20)/5)+(2*2.30324074074074E-05).
How to calculate Raw Sludge Added Per Day given Digestion is Parabolic?
With Volume of Digester (V), Digestion Period (t) & Equivalent Digested Sludge (V2) we can find Raw Sludge Added Per Day given Digestion is Parabolic using the formula - Raw Sludge Added Per Day = ((3*Volume of Digester)/Digestion Period)+(2*Equivalent Digested Sludge).
Can the Raw Sludge Added Per Day given Digestion is Parabolic be negative?
No, the Raw Sludge Added Per Day given Digestion is Parabolic, measured in Volumetric Flow Rate cannot be negative.
Which unit is used to measure Raw Sludge Added Per Day given Digestion is Parabolic?
Raw Sludge Added Per Day given Digestion is Parabolic is usually measured using the Cubic Meter per Day[m³/d] for Volumetric Flow Rate. Cubic Meter per Second[m³/d], Cubic Meter per Hour[m³/d], Cubic Meter per Minute[m³/d] are the few other units in which Raw Sludge Added Per Day given Digestion is Parabolic can be measured.
Copied!