Volume of Earthwork is measured in cubic meters without any allowance for an increase in bulk. Check FAQs
Vearthwork =Lsection(bhalf+rdcenter)22(r-Scutting)
Vearthwork - Volume of Earthwork?Lsection - Length of Road Section?bhalf - Half Width of Formation Level?r - Transverse Slope?dcenter - Depth of Cutting at Centre?Scutting - Side Slope of Cutting?

Quantity of Earthwork for Hilly Road Partially in Cutting Example

With values
With units
Only example

Here is how the Quantity of Earthwork for Hilly Road Partially in Cutting equation looks like with Values.

Here is how the Quantity of Earthwork for Hilly Road Partially in Cutting equation looks like with Units.

Here is how the Quantity of Earthwork for Hilly Road Partially in Cutting equation looks like.

2250Edit=20000Edit(6000Edit+2.5Edit3600Edit)22(2.5Edit-1.5Edit)
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Estimation and Costing » fx Quantity of Earthwork for Hilly Road Partially in Cutting

Quantity of Earthwork for Hilly Road Partially in Cutting Solution

Follow our step by step solution on how to calculate Quantity of Earthwork for Hilly Road Partially in Cutting?

FIRST Step Consider the formula
Vearthwork =Lsection(bhalf+rdcenter)22(r-Scutting)
Next Step Substitute values of Variables
Vearthwork =20000mm(6000mm+2.53600mm)22(2.5-1.5)
Next Step Convert Units
Vearthwork =20m(6m+2.53.6m)22(2.5-1.5)
Next Step Prepare to Evaluate
Vearthwork =20(6+2.53.6)22(2.5-1.5)
LAST Step Evaluate
Vearthwork =2250

Quantity of Earthwork for Hilly Road Partially in Cutting Formula Elements

Variables
Volume of Earthwork
Volume of Earthwork is measured in cubic meters without any allowance for an increase in bulk.
Symbol: Vearthwork
Measurement: VolumeUnit:
Note: Value should be greater than 0.
Length of Road Section
Length of Road Section is the total extent /stretch of the road.
Symbol: Lsection
Measurement: LengthUnit: mm
Note: Value should be greater than 0.
Half Width of Formation Level
Half Width of Formation Level is defined as the value which we get after dividing the total formation level width by 2.
Symbol: bhalf
Measurement: LengthUnit: mm
Note: Value should be greater than 0.
Transverse Slope
Transverse slope is defined as cross slope of ground.
Symbol: r
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Depth of Cutting at Centre
Depth of Cutting at Centre is the height of the bank at the center point of the cross-section of the road.
Symbol: dcenter
Measurement: LengthUnit: mm
Note: Value should be greater than 0.
Side Slope of Cutting
Side Slope of Cutting is the value of the slope of the portion in cutting on a hilly road in partial cutting and banking.
Symbol: Scutting
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other Formulas to find Volume of Earthwork

​Go Quantity of Earthwork for Hilly Road Fully in Cutting or Banking
Vearthwork =LsectionSbhalf2+r2(2bhalfdcenter+Sdcenter2)r2-S2
​Go Quantity of Earthwork for Hilly Road Partially in Banking
Vearthwork =Lsection(bhalf-rdcenter)22(r-Sbanking)

How to Evaluate Quantity of Earthwork for Hilly Road Partially in Cutting?

Quantity of Earthwork for Hilly Road Partially in Cutting evaluator uses Volume of Earthwork = Length of Road Section*((Half Width of Formation Level+Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Cutting)) to evaluate the Volume of Earthwork, The Quantity of Earthwork for Hilly Road Partially in Cutting formula is defined as calculating the quantity of earthwork in the cutting portion of a road, where some part is in banking and some part is in cutting. Volume of Earthwork is denoted by Vearthwork symbol.

How to evaluate Quantity of Earthwork for Hilly Road Partially in Cutting using this online evaluator? To use this online evaluator for Quantity of Earthwork for Hilly Road Partially in Cutting, enter Length of Road Section (Lsection), Half Width of Formation Level (bhalf), Transverse Slope (r), Depth of Cutting at Centre (dcenter) & Side Slope of Cutting (Scutting) and hit the calculate button.

FAQs on Quantity of Earthwork for Hilly Road Partially in Cutting

What is the formula to find Quantity of Earthwork for Hilly Road Partially in Cutting?
The formula of Quantity of Earthwork for Hilly Road Partially in Cutting is expressed as Volume of Earthwork = Length of Road Section*((Half Width of Formation Level+Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Cutting)). Here is an example- 2250 = 20*((6+2.5*3.6)^2)/(2*(2.5-1.5)).
How to calculate Quantity of Earthwork for Hilly Road Partially in Cutting?
With Length of Road Section (Lsection), Half Width of Formation Level (bhalf), Transverse Slope (r), Depth of Cutting at Centre (dcenter) & Side Slope of Cutting (Scutting) we can find Quantity of Earthwork for Hilly Road Partially in Cutting using the formula - Volume of Earthwork = Length of Road Section*((Half Width of Formation Level+Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Cutting)).
What are the other ways to Calculate Volume of Earthwork?
Here are the different ways to Calculate Volume of Earthwork-
  • Volume of Earthwork=Length of Road Section*(Side Slope*Half Width of Formation Level^2+Transverse Slope^2*(2*Half Width of Formation Level*Depth of Cutting at Centre+Side Slope*Depth of Cutting at Centre^2))/(Transverse Slope^2-Side Slope^2)OpenImg
  • Volume of Earthwork=Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking))OpenImg
Can the Quantity of Earthwork for Hilly Road Partially in Cutting be negative?
No, the Quantity of Earthwork for Hilly Road Partially in Cutting, measured in Volume cannot be negative.
Which unit is used to measure Quantity of Earthwork for Hilly Road Partially in Cutting?
Quantity of Earthwork for Hilly Road Partially in Cutting is usually measured using the Cubic Meter[m³] for Volume. Cubic Centimeter[m³], Cubic Millimeter[m³], Liter[m³] are the few other units in which Quantity of Earthwork for Hilly Road Partially in Cutting can be measured.