Volume of Earthwork is measured in cubic meters without any allowance for an increase in bulk. Check FAQs
Vearthwork =Lsection(bhalf-rdcenter)22(r-Sbanking)
Vearthwork - Volume of Earthwork?Lsection - Length of Road Section?bhalf - Half Width of Formation Level?r - Transverse Slope?dcenter - Depth of Cutting at Centre?Sbanking - Side Slope of Banking?

Quantity of Earthwork for Hilly Road Partially in Banking Example

With values
With units
Only example

Here is how the Quantity of Earthwork for Hilly Road Partially in Banking equation looks like with Values.

Here is how the Quantity of Earthwork for Hilly Road Partially in Banking equation looks like with Units.

Here is how the Quantity of Earthwork for Hilly Road Partially in Banking equation looks like.

360Edit=20000Edit(6000Edit-2.5Edit3600Edit)22(2.5Edit-2.25Edit)
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Estimation and Costing » fx Quantity of Earthwork for Hilly Road Partially in Banking

Quantity of Earthwork for Hilly Road Partially in Banking Solution

Follow our step by step solution on how to calculate Quantity of Earthwork for Hilly Road Partially in Banking?

FIRST Step Consider the formula
Vearthwork =Lsection(bhalf-rdcenter)22(r-Sbanking)
Next Step Substitute values of Variables
Vearthwork =20000mm(6000mm-2.53600mm)22(2.5-2.25)
Next Step Convert Units
Vearthwork =20m(6m-2.53.6m)22(2.5-2.25)
Next Step Prepare to Evaluate
Vearthwork =20(6-2.53.6)22(2.5-2.25)
LAST Step Evaluate
Vearthwork =360

Quantity of Earthwork for Hilly Road Partially in Banking Formula Elements

Variables
Volume of Earthwork
Volume of Earthwork is measured in cubic meters without any allowance for an increase in bulk.
Symbol: Vearthwork
Measurement: VolumeUnit:
Note: Value should be greater than 0.
Length of Road Section
Length of Road Section is the total extent /stretch of the road.
Symbol: Lsection
Measurement: LengthUnit: mm
Note: Value should be greater than 0.
Half Width of Formation Level
Half Width of Formation Level is defined as the value which we get after dividing the total formation level width by 2.
Symbol: bhalf
Measurement: LengthUnit: mm
Note: Value should be greater than 0.
Transverse Slope
Transverse slope is defined as cross slope of ground.
Symbol: r
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Depth of Cutting at Centre
Depth of Cutting at Centre is the height of the bank at the center point of the cross-section of the road.
Symbol: dcenter
Measurement: LengthUnit: mm
Note: Value should be greater than 0.
Side Slope of Banking
Side Slope of Banking is the value of the slope of the banked portion of embankment on a hilly road which is partially in cutting and banking.
Symbol: Sbanking
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other Formulas to find Volume of Earthwork

​Go Quantity of Earthwork for Hilly Road Fully in Cutting or Banking
Vearthwork =LsectionSbhalf2+r2(2bhalfdcenter+Sdcenter2)r2-S2
​Go Quantity of Earthwork for Hilly Road Partially in Cutting
Vearthwork =Lsection(bhalf+rdcenter)22(r-Scutting)

How to Evaluate Quantity of Earthwork for Hilly Road Partially in Banking?

Quantity of Earthwork for Hilly Road Partially in Banking evaluator uses Volume of Earthwork = Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking)) to evaluate the Volume of Earthwork, The Quantity of Earthwork for Hilly Road Partially in Banking formula is defined as calculating the quantity of earthwork needed for the banking portion of a road, where some part is in banking and some part is in cutting. Volume of Earthwork is denoted by Vearthwork symbol.

How to evaluate Quantity of Earthwork for Hilly Road Partially in Banking using this online evaluator? To use this online evaluator for Quantity of Earthwork for Hilly Road Partially in Banking, enter Length of Road Section (Lsection), Half Width of Formation Level (bhalf), Transverse Slope (r), Depth of Cutting at Centre (dcenter) & Side Slope of Banking (Sbanking) and hit the calculate button.

FAQs on Quantity of Earthwork for Hilly Road Partially in Banking

What is the formula to find Quantity of Earthwork for Hilly Road Partially in Banking?
The formula of Quantity of Earthwork for Hilly Road Partially in Banking is expressed as Volume of Earthwork = Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking)). Here is an example- 360 = 20*((6-2.5*3.6)^2)/(2*(2.5-2.25)).
How to calculate Quantity of Earthwork for Hilly Road Partially in Banking?
With Length of Road Section (Lsection), Half Width of Formation Level (bhalf), Transverse Slope (r), Depth of Cutting at Centre (dcenter) & Side Slope of Banking (Sbanking) we can find Quantity of Earthwork for Hilly Road Partially in Banking using the formula - Volume of Earthwork = Length of Road Section*((Half Width of Formation Level-Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Banking)).
What are the other ways to Calculate Volume of Earthwork?
Here are the different ways to Calculate Volume of Earthwork-
  • Volume of Earthwork=Length of Road Section*(Side Slope*Half Width of Formation Level^2+Transverse Slope^2*(2*Half Width of Formation Level*Depth of Cutting at Centre+Side Slope*Depth of Cutting at Centre^2))/(Transverse Slope^2-Side Slope^2)OpenImg
  • Volume of Earthwork=Length of Road Section*((Half Width of Formation Level+Transverse Slope*Depth of Cutting at Centre)^2)/(2*(Transverse Slope-Side Slope of Cutting))OpenImg
Can the Quantity of Earthwork for Hilly Road Partially in Banking be negative?
No, the Quantity of Earthwork for Hilly Road Partially in Banking, measured in Volume cannot be negative.
Which unit is used to measure Quantity of Earthwork for Hilly Road Partially in Banking?
Quantity of Earthwork for Hilly Road Partially in Banking is usually measured using the Cubic Meter[m³] for Volume. Cubic Centimeter[m³], Cubic Millimeter[m³], Liter[m³] are the few other units in which Quantity of Earthwork for Hilly Road Partially in Banking can be measured.