Priority of Objective Period of Design given Minimum Design Index Formula

Fx Copy
LaTeX Copy
Period Priority (%) is a factor which shows the priority of time factor on a percentage scale. It is oriented according to the user's definition of priorities. Check FAQs
Pt=(DImin100)-(WIPw)-(CIPc)TI
Pt - Period Priority (%)?DImin - Minimum Design Index?WI - Weight Index?Pw - Weight Priority (%)?CI - Cost Index?Pc - Cost Priority (%)?TI - Period Index?

Priority of Objective Period of Design given Minimum Design Index Example

With values
With units
Only example

Here is how the Priority of Objective Period of Design given Minimum Design Index equation looks like with Values.

Here is how the Priority of Objective Period of Design given Minimum Design Index equation looks like with Units.

Here is how the Priority of Objective Period of Design given Minimum Design Index equation looks like.

19Edit=(160Edit100)-(50.98Edit15.1Edit)-(1327.913Edit10.11Edit)95Edit
You are here -
HomeIcon Home » Category Physics » Category Aerospace » Category Aircraft Mechanics » fx Priority of Objective Period of Design given Minimum Design Index

Priority of Objective Period of Design given Minimum Design Index Solution

Follow our step by step solution on how to calculate Priority of Objective Period of Design given Minimum Design Index?

FIRST Step Consider the formula
Pt=(DImin100)-(WIPw)-(CIPc)TI
Next Step Substitute values of Variables
Pt=(160100)-(50.9815.1)-(1327.91310.11)95
Next Step Prepare to Evaluate
Pt=(160100)-(50.9815.1)-(1327.91310.11)95
Next Step Evaluate
Pt=19.0000165263158
LAST Step Rounding Answer
Pt=19

Priority of Objective Period of Design given Minimum Design Index Formula Elements

Variables
Period Priority (%)
Period Priority (%) is a factor which shows the priority of time factor on a percentage scale. It is oriented according to the user's definition of priorities.
Symbol: Pt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Minimum Design Index
Minimum Design Index is a comparable quantity in conceptual design phase which considers Cost, Weight and Time period indices.
Symbol: DImin
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Weight Index
Weight Index is the summation of all the contributors in weight configuration parameters. The weight configuration parameters are valued on the scale of 0-10 (best=10 and worst=0).
Symbol: WI
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Weight Priority (%)
Weight Priority (%) is a factor which shows the priority of Weight factor on a percentage scale. It is oriented according to the user's definition of priorities.
Symbol: Pw
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost Index
Cost Index is the summation of all the contributors in cost configuration parameters. The cost configuration parameters are valued on the scale of 0-10 (best=10 and worst=0).
Symbol: CI
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost Priority (%)
Cost Priority (%) is a factor which shows the priority of cost objective on a percentage scale. It is oriented according to the user's definition of priorities.
Symbol: Pc
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Period Index
Period Index is the summation of all the contributors in period configuration parameters. The Period configuration parameters are valued on the scale of 0-10 (best=10 and worst=0).
Symbol: TI
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Design Process category

​Go Minimum Design Index
DImin=(CIPc)+(WIPw)+(TIPt)100
​Go Cost Index given Minimum Design Index
CI=(DImin100)-(WIPw)-(TIPt)Pc

How to Evaluate Priority of Objective Period of Design given Minimum Design Index?

Priority of Objective Period of Design given Minimum Design Index evaluator uses Period Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Cost Index*Cost Priority (%)))/Period Index to evaluate the Period Priority (%), The Priority of Objective Period of Design given Minimum Design Index signifies the importance placed on the duration over which the aircraft design remains relevant and effective in meeting operational requirements, this priority reflects the desire to ensure that the design achieves longevity, adaptability, and technological currency throughout its service life. Period Priority (%) is denoted by Pt symbol.

How to evaluate Priority of Objective Period of Design given Minimum Design Index using this online evaluator? To use this online evaluator for Priority of Objective Period of Design given Minimum Design Index, enter Minimum Design Index (DImin), Weight Index (WI), Weight Priority (%) (Pw), Cost Index (CI), Cost Priority (%) (Pc) & Period Index (TI) and hit the calculate button.

FAQs on Priority of Objective Period of Design given Minimum Design Index

What is the formula to find Priority of Objective Period of Design given Minimum Design Index?
The formula of Priority of Objective Period of Design given Minimum Design Index is expressed as Period Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Cost Index*Cost Priority (%)))/Period Index. Here is an example- 154.4648 = ((160*100)-(50.98*15.1)-(1327.913*10.11))/95.
How to calculate Priority of Objective Period of Design given Minimum Design Index?
With Minimum Design Index (DImin), Weight Index (WI), Weight Priority (%) (Pw), Cost Index (CI), Cost Priority (%) (Pc) & Period Index (TI) we can find Priority of Objective Period of Design given Minimum Design Index using the formula - Period Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Cost Index*Cost Priority (%)))/Period Index.
Copied!