Plant Use Factor evaluator uses Plant Use Factor = Maximum Demand/Plant Capacity to evaluate the Plant Use Factor, Plant Use Factor is defined as “the ratio of actual energy produced (in kWh) in a given time period to the product of plant capacity and the number of hours the plant was in operation”. Plant Use Factor is denoted by Plant Factor symbol.
How to evaluate Plant Use Factor using this online evaluator? To use this online evaluator for Plant Use Factor, enter Maximum Demand (Max Demand) & Plant Capacity (Plant Capacity) and hit the calculate button.