Plant Capacity Factor Formula

Fx Copy
LaTeX Copy
Capacity Factor is the ratio of the average demand to the installed capacity of the plant. Check FAQs
Capacity Factor=Avg DemandPlant Capacity
Capacity Factor - Capacity Factor?Avg Demand - Average Demand?Plant Capacity - Plant Capacity?

Plant Capacity Factor Example

With values
With units
Only example

Here is how the Plant Capacity Factor equation looks like with Values.

Here is how the Plant Capacity Factor equation looks like with Units.

Here is how the Plant Capacity Factor equation looks like.

0.4383Edit=1260Edit2875Edit
You are here -
HomeIcon Home » Category Engineering » Category Electrical » Category Power Plant Operations » fx Plant Capacity Factor

Plant Capacity Factor Solution

Follow our step by step solution on how to calculate Plant Capacity Factor?

FIRST Step Consider the formula
Capacity Factor=Avg DemandPlant Capacity
Next Step Substitute values of Variables
Capacity Factor=1260kW2875kW
Next Step Convert Units
Capacity Factor=1.3E+6W2.9E+6W
Next Step Prepare to Evaluate
Capacity Factor=1.3E+62.9E+6
Next Step Evaluate
Capacity Factor=0.438260869565217
LAST Step Rounding Answer
Capacity Factor=0.4383

Plant Capacity Factor Formula Elements

Variables
Capacity Factor
Capacity Factor is the ratio of the average demand to the installed capacity of the plant.
Symbol: Capacity Factor
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Average Demand
The Average Demand is defined as the average of loads occurring on the power station in a given period (day or month or year). It is known as average load or average demand.
Symbol: Avg Demand
Measurement: PowerUnit: kW
Note: Value can be positive or negative.
Plant Capacity
Plant Capacity is the total capacity of the energy which is produced in the plant or can provide energy to system.
Symbol: Plant Capacity
Measurement: PowerUnit: kW
Note: Value should be greater than 0.

Other formulas in Power Plant Operational Factors category

​Go Average Load for Load Curve
Avg Load=AL24
​Go Load Factor given Average Load and Maximum Demand
Load Factor=Avg LoadMax Demand
​Go Unit Generated per Annum
Pg=Max DemandLoad Factor8760
​Go Demand Factor
Demand Factor=Max DemandConnected Load

How to Evaluate Plant Capacity Factor?

Plant Capacity Factor evaluator uses Capacity Factor = Average Demand/Plant Capacity to evaluate the Capacity Factor, The Plant Capacity Factor formula is defined as the ratio of the average demand to the installed capacity of the plant. Capacity Factor is denoted by Capacity Factor symbol.

How to evaluate Plant Capacity Factor using this online evaluator? To use this online evaluator for Plant Capacity Factor, enter Average Demand (Avg Demand) & Plant Capacity (Plant Capacity) and hit the calculate button.

FAQs on Plant Capacity Factor

What is the formula to find Plant Capacity Factor?
The formula of Plant Capacity Factor is expressed as Capacity Factor = Average Demand/Plant Capacity. Here is an example- 0.438261 = 1260000/2875000.
How to calculate Plant Capacity Factor?
With Average Demand (Avg Demand) & Plant Capacity (Plant Capacity) we can find Plant Capacity Factor using the formula - Capacity Factor = Average Demand/Plant Capacity.
Copied!