Period t3 Manufacturing Model evaluator uses Period t3 Manufacturing Model with Shortage = Maximum Stock out Manufacturing Model/Demand per Year to evaluate the Period t3 Manufacturing Model with Shortage, Period t3 manufacturing model with the shortage is when the inventory level of the finished product reaches zero, and the shortage is building at the rate r. Period t3 Manufacturing Model with Shortage is denoted by t3 symbol.
How to evaluate Period t3 Manufacturing Model using this online evaluator? To use this online evaluator for Period t3 Manufacturing Model, enter Maximum Stock out Manufacturing Model (Q1) & Demand per Year (D) and hit the calculate button.