Period t1 Manufacturing with Shortage evaluator uses Period t1 Manufacturing with Shortage = Maximum Inventory Manufacturing Model/(Production Rate-Demand per Year) to evaluate the Period t1 Manufacturing with Shortage, Period t1 manufacturing with shortage is the period in which the item is produced at the rate of k units per period and simultaneously it is consumed at the rate of r units per period. Period t1 Manufacturing with Shortage is denoted by t1 ms symbol.
How to evaluate Period t1 Manufacturing with Shortage using this online evaluator? To use this online evaluator for Period t1 Manufacturing with Shortage, enter Maximum Inventory Manufacturing Model (Qmfg), Production Rate (K) & Demand per Year (D) and hit the calculate button.