Peak Rate of Runoff from Nawab Jung Bahadur Formula Formula

Fx Copy
LaTeX Copy
The Peak Rate of Runoff for Nawab Jung Bahadur Formula estimates stormwater runoff using parameters to determine the maximum flow rate. Check FAQs
QNJB=C2(Akm)0.93-(114)log10(Akm)
QNJB - Peak Rate of Runoff for Nawab Jung Bahadur?C2 - Coefficient?Akm - Catchment Area in KM?

Peak Rate of Runoff from Nawab Jung Bahadur Formula Example

With values
With units
Only example

Here is how the Peak Rate of Runoff from Nawab Jung Bahadur Formula equation looks like with Values.

Here is how the Peak Rate of Runoff from Nawab Jung Bahadur Formula equation looks like with Units.

Here is how the Peak Rate of Runoff from Nawab Jung Bahadur Formula equation looks like.

125.6423Edit=55Edit(2.5Edit)0.93-(114)log10(2.5Edit)
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Environmental Engineering » fx Peak Rate of Runoff from Nawab Jung Bahadur Formula

Peak Rate of Runoff from Nawab Jung Bahadur Formula Solution

Follow our step by step solution on how to calculate Peak Rate of Runoff from Nawab Jung Bahadur Formula?

FIRST Step Consider the formula
QNJB=C2(Akm)0.93-(114)log10(Akm)
Next Step Substitute values of Variables
QNJB=55(2.5km²)0.93-(114)log10(2.5km²)
Next Step Prepare to Evaluate
QNJB=55(2.5)0.93-(114)log10(2.5)
Next Step Evaluate
QNJB=125.642259162859m³/s
LAST Step Rounding Answer
QNJB=125.6423m³/s

Peak Rate of Runoff from Nawab Jung Bahadur Formula Formula Elements

Variables
Functions
Peak Rate of Runoff for Nawab Jung Bahadur
The Peak Rate of Runoff for Nawab Jung Bahadur Formula estimates stormwater runoff using parameters to determine the maximum flow rate.
Symbol: QNJB
Measurement: Volumetric Flow RateUnit: m³/s
Note: Value should be greater than 0.
Coefficient
The Coefficient was defined as the numerical value being multiplied by a variable; or, as any number being multiplied by a variable.
Symbol: C2
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Catchment Area in KM
Catchment Area in KM measured in square kilometers, refers to the geographical region from which water drains into a specific river, lake, or reservoir.
Symbol: Akm
Measurement: AreaUnit: km²
Note: Value can be positive or negative.
log10
The common logarithm, also known as the base-10 logarithm or the decimal logarithm, is a mathematical function that is the inverse of the exponential function.
Syntax: log10(Number)

How to Evaluate Peak Rate of Runoff from Nawab Jung Bahadur Formula?

Peak Rate of Runoff from Nawab Jung Bahadur Formula evaluator uses Peak Rate of Runoff for Nawab Jung Bahadur = Coefficient*(Catchment Area in KM)^(0.93-(1/14)*log10(Catchment Area in KM)) to evaluate the Peak Rate of Runoff for Nawab Jung Bahadur, The Peak Rate of Runoff from Nawab Jung Bahadur Formula is defined as the maximum rate of flow during a storm event. It is a critical factor in designing storm water management systems, such as culverts, storm sewers, and detention basins. Peak Rate of Runoff for Nawab Jung Bahadur is denoted by QNJB symbol.

How to evaluate Peak Rate of Runoff from Nawab Jung Bahadur Formula using this online evaluator? To use this online evaluator for Peak Rate of Runoff from Nawab Jung Bahadur Formula, enter Coefficient (C2) & Catchment Area in KM (Akm) and hit the calculate button.

FAQs on Peak Rate of Runoff from Nawab Jung Bahadur Formula

What is the formula to find Peak Rate of Runoff from Nawab Jung Bahadur Formula?
The formula of Peak Rate of Runoff from Nawab Jung Bahadur Formula is expressed as Peak Rate of Runoff for Nawab Jung Bahadur = Coefficient*(Catchment Area in KM)^(0.93-(1/14)*log10(Catchment Area in KM)). Here is an example- 125.6423 = 55*(2500000)^(0.93-(1/14)*log10(2500000)).
How to calculate Peak Rate of Runoff from Nawab Jung Bahadur Formula?
With Coefficient (C2) & Catchment Area in KM (Akm) we can find Peak Rate of Runoff from Nawab Jung Bahadur Formula using the formula - Peak Rate of Runoff for Nawab Jung Bahadur = Coefficient*(Catchment Area in KM)^(0.93-(1/14)*log10(Catchment Area in KM)). This formula also uses Common Logarithm (log10) function(s).
Can the Peak Rate of Runoff from Nawab Jung Bahadur Formula be negative?
No, the Peak Rate of Runoff from Nawab Jung Bahadur Formula, measured in Volumetric Flow Rate cannot be negative.
Which unit is used to measure Peak Rate of Runoff from Nawab Jung Bahadur Formula?
Peak Rate of Runoff from Nawab Jung Bahadur Formula is usually measured using the Cubic Meter per Second[m³/s] for Volumetric Flow Rate. Cubic Meter per Day[m³/s], Cubic Meter per Hour[m³/s], Cubic Meter per Minute[m³/s] are the few other units in which Peak Rate of Runoff from Nawab Jung Bahadur Formula can be measured.
Copied!