Peak Rate of Runoff from Dredge Formula evaluator uses Peak Rate of Runoff from Dredge Formula = 19.6*(Catchment Area in KM/(Length of Drain)^(2/3)) to evaluate the Peak Rate of Runoff from Dredge Formula, The Peak Rate of Runoff from Dredge Formula is defined as the maximum rate of flow during a storm event. It is a critical factor in designing storm water management systems, such as culverts, storm sewers, and detention basins. Peak Rate of Runoff from Dredge Formula is denoted by Qd symbol.
How to evaluate Peak Rate of Runoff from Dredge Formula using this online evaluator? To use this online evaluator for Peak Rate of Runoff from Dredge Formula, enter Catchment Area in KM (Akm) & Length of Drain (L) and hit the calculate button.