Peak Load given Load Factor for Turbo-Generators Formula

Fx Copy
LaTeX Copy
Peak Load is the maximum load on an electrical power-supply system. Check FAQs
PL=LAvgLF
PL - Peak Load?LAvg - Average Load?LF - Load Factor?

Peak Load given Load Factor for Turbo-Generators Example

With values
With units
Only example

Here is how the Peak Load given Load Factor for Turbo-Generators equation looks like with Values.

Here is how the Peak Load given Load Factor for Turbo-Generators equation looks like with Units.

Here is how the Peak Load given Load Factor for Turbo-Generators equation looks like.

4Edit=400Edit0.1Edit
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Hydraulics and Waterworks » fx Peak Load given Load Factor for Turbo-Generators

Peak Load given Load Factor for Turbo-Generators Solution

Follow our step by step solution on how to calculate Peak Load given Load Factor for Turbo-Generators?

FIRST Step Consider the formula
PL=LAvgLF
Next Step Substitute values of Variables
PL=400W0.1
Next Step Prepare to Evaluate
PL=4000.1
Next Step Evaluate
PL=4000W
LAST Step Convert to Output's Unit
PL=4kW

Peak Load given Load Factor for Turbo-Generators Formula Elements

Variables
Peak Load
Peak Load is the maximum load on an electrical power-supply system.
Symbol: PL
Measurement: PowerUnit: kW
Note: Value should be greater than 0.
Average Load
Average Load is the average load occurring on the power station in a given period known as an average load.
Symbol: LAvg
Measurement: PowerUnit: W
Note: Value should be greater than 0.
Load Factor
Load Factor is the ratio of average load to the maximum demand during a given period.
Symbol: LF
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.

Other formulas in Water Power Engineering category

​Go Load Factor for Turbo-generators
LF=LAvgPL
​Go Average Load given Load Factor for Turbo-generators
LAvg=LFPL
​Go Plant Factor
p=Ew
​Go Energy Actually Produced given Plant Factor
E=pw

How to Evaluate Peak Load given Load Factor for Turbo-Generators?

Peak Load given Load Factor for Turbo-Generators evaluator uses Peak Load = Average Load/Load Factor to evaluate the Peak Load, The Peak Load given Load Factor for Turbo-Generators is defined as the period of time when electrical power is needed sustained period based on demand. Also known as peak demand. Peak Load is denoted by PL symbol.

How to evaluate Peak Load given Load Factor for Turbo-Generators using this online evaluator? To use this online evaluator for Peak Load given Load Factor for Turbo-Generators, enter Average Load (LAvg) & Load Factor (LF) and hit the calculate button.

FAQs on Peak Load given Load Factor for Turbo-Generators

What is the formula to find Peak Load given Load Factor for Turbo-Generators?
The formula of Peak Load given Load Factor for Turbo-Generators is expressed as Peak Load = Average Load/Load Factor. Here is an example- 0.004 = 400/0.1.
How to calculate Peak Load given Load Factor for Turbo-Generators?
With Average Load (LAvg) & Load Factor (LF) we can find Peak Load given Load Factor for Turbo-Generators using the formula - Peak Load = Average Load/Load Factor.
Can the Peak Load given Load Factor for Turbo-Generators be negative?
No, the Peak Load given Load Factor for Turbo-Generators, measured in Power cannot be negative.
Which unit is used to measure Peak Load given Load Factor for Turbo-Generators?
Peak Load given Load Factor for Turbo-Generators is usually measured using the Kilowatt[kW] for Power. Watt[kW], Milliwatt[kW], Microwatt[kW] are the few other units in which Peak Load given Load Factor for Turbo-Generators can be measured.