Fx Copy
LaTeX Copy
Original volume of Soil is the volume of soil before excavation. Check FAQs
VO=(100100+0.01s)VL
VO - Original volume of Soil?s - Swell in Soil?VL - Loaded Volume?

Original Volume of Soil before Excavation given Percent Swell Example

With values
With units
Only example

Here is how the Original Volume of Soil before Excavation given Percent Swell equation looks like with Values.

Here is how the Original Volume of Soil before Excavation given Percent Swell equation looks like with Units.

Here is how the Original Volume of Soil before Excavation given Percent Swell equation looks like.

24.9875Edit=(100100+0.015Edit)25Edit
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Geotechnical Engineering » fx Original Volume of Soil before Excavation given Percent Swell

Original Volume of Soil before Excavation given Percent Swell Solution

Follow our step by step solution on how to calculate Original Volume of Soil before Excavation given Percent Swell?

FIRST Step Consider the formula
VO=(100100+0.01s)VL
Next Step Substitute values of Variables
VO=(100100+0.015)25
Next Step Prepare to Evaluate
VO=(100100+0.015)25
Next Step Evaluate
VO=24.9875062468766
LAST Step Rounding Answer
VO=24.9875

Original Volume of Soil before Excavation given Percent Swell Formula Elements

Variables
Original volume of Soil
Original volume of Soil is the volume of soil before excavation.
Symbol: VO
Measurement: VolumeUnit:
Note: Value should be greater than 0.
Swell in Soil
Swell in Soil is change in volume when subjected to moisture.
Symbol: s
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Loaded Volume
Loaded Volume is the volume of soil after excavation.
Symbol: VL
Measurement: VolumeUnit:
Note: Value should be greater than 0.

Other Formulas to find Original volume of Soil

​Go Original Volume of Soil before Excavation
VO=VLLF
​Go Original Volume of Soil given Compacted Volume
VO=(VcS)

Other formulas in Earth Quantities Hauled category

​Go Loaded Volume of Soil given Original Volume of Soil
VL=(VOLF)
​Go Load Factor given Original Volume of Soil
LF=(VOVL)
​Go Loaded Volume of Soil given Percent Swell
VL=(VO100+0.01s100)
​Go Swell in Soil given Original Volume of Soil
s'=10000((VLVO)-1)

How to Evaluate Original Volume of Soil before Excavation given Percent Swell?

Original Volume of Soil before Excavation given Percent Swell evaluator uses Original volume of Soil = (100/(100+0.01*Swell in Soil))*Loaded Volume to evaluate the Original volume of Soil, The Original Volume of Soil before Excavation given Percent Swell formula is defined as the volume of soil before excavation when we have the prior knowledge of the percent swell. Original volume of Soil is denoted by VO symbol.

How to evaluate Original Volume of Soil before Excavation given Percent Swell using this online evaluator? To use this online evaluator for Original Volume of Soil before Excavation given Percent Swell, enter Swell in Soil (s) & Loaded Volume (VL) and hit the calculate button.

FAQs on Original Volume of Soil before Excavation given Percent Swell

What is the formula to find Original Volume of Soil before Excavation given Percent Swell?
The formula of Original Volume of Soil before Excavation given Percent Swell is expressed as Original volume of Soil = (100/(100+0.01*Swell in Soil))*Loaded Volume. Here is an example- 24.98751 = (100/(100+0.01*5))*25.
How to calculate Original Volume of Soil before Excavation given Percent Swell?
With Swell in Soil (s) & Loaded Volume (VL) we can find Original Volume of Soil before Excavation given Percent Swell using the formula - Original volume of Soil = (100/(100+0.01*Swell in Soil))*Loaded Volume.
What are the other ways to Calculate Original volume of Soil?
Here are the different ways to Calculate Original volume of Soil-
  • Original volume of Soil=Loaded Volume*Load FactorOpenImg
  • Original volume of Soil=(Compacted Volume/Shrinkage Factor)OpenImg
Can the Original Volume of Soil before Excavation given Percent Swell be negative?
No, the Original Volume of Soil before Excavation given Percent Swell, measured in Volume cannot be negative.
Which unit is used to measure Original Volume of Soil before Excavation given Percent Swell?
Original Volume of Soil before Excavation given Percent Swell is usually measured using the Cubic Meter[m³] for Volume. Cubic Centimeter[m³], Cubic Millimeter[m³], Liter[m³] are the few other units in which Original Volume of Soil before Excavation given Percent Swell can be measured.
Copied!