Operator's Wage Rate given Machining and Operating Rate Formula

Fx Copy
LaTeX Copy
Wage Rate is defined as the worker's/operator's rate of pay. Check FAQs
Wo=(M-(Mt100+%mach100))100100+%opt
Wo - Wage Rate?M - Machining and Operating Rate?Mt - Depreciation Rate?%mach - Machine Overhead Percentage?%opt - Operator's Overhead Percentage?

Operator's Wage Rate given Machining and Operating Rate Example

With values
With units
Only example

Here is how the Operator's Wage Rate given Machining and Operating Rate equation looks like with Values.

Here is how the Operator's Wage Rate given Machining and Operating Rate equation looks like with Units.

Here is how the Operator's Wage Rate given Machining and Operating Rate equation looks like.

83.1875Edit=(100Edit-(0.1Edit100+75Edit100))100100+20Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Operator's Wage Rate given Machining and Operating Rate

Operator's Wage Rate given Machining and Operating Rate Solution

Follow our step by step solution on how to calculate Operator's Wage Rate given Machining and Operating Rate?

FIRST Step Consider the formula
Wo=(M-(Mt100+%mach100))100100+%opt
Next Step Substitute values of Variables
Wo=(100-(0.1100+75100))100100+20
Next Step Prepare to Evaluate
Wo=(100-(0.1100+75100))100100+20
LAST Step Evaluate
Wo=83.1875

Operator's Wage Rate given Machining and Operating Rate Formula Elements

Variables
Wage Rate
Wage Rate is defined as the worker's/operator's rate of pay.
Symbol: Wo
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Machining and Operating Rate
Machining and Operating Rate is the money charged for processing on and operating machines per unit time, including overheads.
Symbol: M
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Depreciation Rate
Depreciation Rate is the rate at which the machine is depreciated across the estimated productive life of the machine.
Symbol: Mt
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Machine Overhead Percentage
Machine Overhead Percentage is the percentage of Capital spent on it, regardless of any work it performs.
Symbol: %mach
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Operator's Overhead Percentage
Operator's Overhead Percentage is the percentage of his wage Rate spent indirectly on him, regardless of any revenue generated.
Symbol: %opt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Estimation Cost category

​Go Operator's Overhead Percentage given Machining and Operating Rate
%opt=((M-(Mt100+%mach100))100Wo)-100
​Go Machine Overhead Percentage given Machining and Operating Rate
%mach=((M-(Wo100+%opt100))100Mt)-100
​Go Machining and Operating Rate
M=(Wo100+%opt100)+(Mt100+%mach100)
​Go Initial Cost of Machine given Depreciation Rate
Cmach=PamortNwhMt

How to Evaluate Operator's Wage Rate given Machining and Operating Rate?

Operator's Wage Rate given Machining and Operating Rate evaluator uses Wage Rate = (Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/(100+Operator's Overhead Percentage) to evaluate the Wage Rate, The Operator's Wage Rate given Machining and Operating Rate is a method to determine the maximum rate of Pay to the operator when total expense on Machining and Operating is limited. Wage Rate is denoted by Wo symbol.

How to evaluate Operator's Wage Rate given Machining and Operating Rate using this online evaluator? To use this online evaluator for Operator's Wage Rate given Machining and Operating Rate, enter Machining and Operating Rate (M), Depreciation Rate (Mt), Machine Overhead Percentage (%mach) & Operator's Overhead Percentage (%opt) and hit the calculate button.

FAQs on Operator's Wage Rate given Machining and Operating Rate

What is the formula to find Operator's Wage Rate given Machining and Operating Rate?
The formula of Operator's Wage Rate given Machining and Operating Rate is expressed as Wage Rate = (Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/(100+Operator's Overhead Percentage). Here is an example- 83.1875 = (100-(0.1*(100+75)/100))*100/(100+20).
How to calculate Operator's Wage Rate given Machining and Operating Rate?
With Machining and Operating Rate (M), Depreciation Rate (Mt), Machine Overhead Percentage (%mach) & Operator's Overhead Percentage (%opt) we can find Operator's Wage Rate given Machining and Operating Rate using the formula - Wage Rate = (Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/(100+Operator's Overhead Percentage).
Copied!