Non-Productive Time for Each Component given Average Production Time Formula

Fx Copy
LaTeX Copy
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component. Check FAQs
ts=tp-(tm+(NttcNb))
ts - Setup Time?tp - Average Production Time?tm - Machining Time?Nt - Number of Tools Used?tc - Time to Change One Tool?Nb - Batch Size?

Non-Productive Time for Each Component given Average Production Time Example

With values
With units
Only example

Here is how the Non-Productive Time for Each Component given Average Production Time equation looks like with Values.

Here is how the Non-Productive Time for Each Component given Average Production Time equation looks like with Units.

Here is how the Non-Productive Time for Each Component given Average Production Time equation looks like.

54Edit=550Edit-(46Edit+(3Edit300Edit2Edit))
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Non-Productive Time for Each Component given Average Production Time

Non-Productive Time for Each Component given Average Production Time Solution

Follow our step by step solution on how to calculate Non-Productive Time for Each Component given Average Production Time?

FIRST Step Consider the formula
ts=tp-(tm+(NttcNb))
Next Step Substitute values of Variables
ts=550s-(46s+(3300s2))
Next Step Prepare to Evaluate
ts=550-(46+(33002))
LAST Step Evaluate
ts=54s

Non-Productive Time for Each Component given Average Production Time Formula Elements

Variables
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Average Production Time
Average Production Time is the time taken to produce a single component out of a lot of produced batches.
Symbol: tp
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Machining Time
Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material.
Symbol: tm
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Time to Change One Tool
Time to Change One Tool is the measure of time it takes to change one tool during machining.
Symbol: tc
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Batch Size
Batch Size is the count of similar kinds of products to be manufactured.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Average Production Time category

​Go Average Production Time of Each Component
tp=ts+tm+(NttcNb)
​Go Machining Time of Each Component given Average Production Time
tm=tp-ts-(NttcNb)
​Go Time for changing one Tool given Average Production Time
tc=(tp-(ts+tm))NbNt
​Go Batch Size given Average Production Time
Nb=tcNttp-(ts+tm)

How to Evaluate Non-Productive Time for Each Component given Average Production Time?

Non-Productive Time for Each Component given Average Production Time evaluator uses Setup Time = Average Production Time-(Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size)) to evaluate the Setup Time, Non-Productive Time for Each Component given Average Production Time is method to determine maximum time that can be spent to load/unload workpiece and/or reposition tool for manufacturing of single product such that Total Cost of Production is Minimum. Setup Time is denoted by ts symbol.

How to evaluate Non-Productive Time for Each Component given Average Production Time using this online evaluator? To use this online evaluator for Non-Productive Time for Each Component given Average Production Time, enter Average Production Time (tp), Machining Time (tm), Number of Tools Used (Nt), Time to Change One Tool (tc) & Batch Size (Nb) and hit the calculate button.

FAQs on Non-Productive Time for Each Component given Average Production Time

What is the formula to find Non-Productive Time for Each Component given Average Production Time?
The formula of Non-Productive Time for Each Component given Average Production Time is expressed as Setup Time = Average Production Time-(Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size)). Here is an example- 110 = 550-(46+(3*300/2)).
How to calculate Non-Productive Time for Each Component given Average Production Time?
With Average Production Time (tp), Machining Time (tm), Number of Tools Used (Nt), Time to Change One Tool (tc) & Batch Size (Nb) we can find Non-Productive Time for Each Component given Average Production Time using the formula - Setup Time = Average Production Time-(Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size)).
Can the Non-Productive Time for Each Component given Average Production Time be negative?
No, the Non-Productive Time for Each Component given Average Production Time, measured in Time cannot be negative.
Which unit is used to measure Non-Productive Time for Each Component given Average Production Time?
Non-Productive Time for Each Component given Average Production Time is usually measured using the Second[s] for Time. Millisecond[s], Microsecond[s], Nanosecond[s] are the few other units in which Non-Productive Time for Each Component given Average Production Time can be measured.