Modified Basin Lag for Effective Duration evaluator uses Modified Basin Lag = (21*Basin Lag/22)+(Non-standard rainfall duration/4) to evaluate the Modified Basin Lag, The Modified Basin Lag for Effective Duration formula is defined as the elapsed time between the occurrences of the centroids of the effective rainfall and of the storm runoff hydrograph and is an important factor in determining the time to peak of the unit. Modified Basin Lag is denoted by t'p symbol.
How to evaluate Modified Basin Lag for Effective Duration using this online evaluator? To use this online evaluator for Modified Basin Lag for Effective Duration, enter Basin Lag (tp) & Non-standard rainfall duration (tR) and hit the calculate button.