Maximum Voltage using Load Current (2 Phase 4 Wire US) evaluator uses Maximum Voltage Underground AC = sqrt(2)*Power Transmitted/(Current Underground AC*cos(Phase Difference)) to evaluate the Maximum Voltage Underground AC, The Maximum Voltage using Load Current (2 phase 4 wire US) formula is defined as the highest voltage rating for electrical devices and equipment that can be used with the voltage definition. Maximum Voltage Underground AC is denoted by Vm symbol.
How to evaluate Maximum Voltage using Load Current (2 Phase 4 Wire US) using this online evaluator? To use this online evaluator for Maximum Voltage using Load Current (2 Phase 4 Wire US), enter Power Transmitted (P), Current Underground AC (I) & Phase Difference (Φ) and hit the calculate button.