Maximum Production Rate Formula

Fx Copy
LaTeX Copy
Maximum Production Rate is the profitable rate in which product must be defined as per economy of machining. Check FAQs
PRmaximum=C((1NOR-1)TCT)NOR
PRmaximum - Maximum Production Rate?C - Cost of metal cutting?NOR - Number of Rotations?TCT - Tool Changing Time?

Maximum Production Rate Example

With values
With units
Only example

Here is how the Maximum Production Rate equation looks like with Values.

Here is how the Maximum Production Rate equation looks like with Units.

Here is how the Maximum Production Rate equation looks like.

1384.083Edit=1000Edit((12Edit-1)1.7Edit)2Edit
You are here -
HomeIcon Home » Category Engineering » Category Mechanical » Category Manufacturing » fx Maximum Production Rate

Maximum Production Rate Solution

Follow our step by step solution on how to calculate Maximum Production Rate?

FIRST Step Consider the formula
PRmaximum=C((1NOR-1)TCT)NOR
Next Step Substitute values of Variables
PRmaximum=1000((12-1)1.7s)2
Next Step Prepare to Evaluate
PRmaximum=1000((12-1)1.7)2
Next Step Evaluate
PRmaximum=1384.0830449827
LAST Step Rounding Answer
PRmaximum=1384.083

Maximum Production Rate Formula Elements

Variables
Maximum Production Rate
Maximum Production Rate is the profitable rate in which product must be defined as per economy of machining.
Symbol: PRmaximum
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Cost of metal cutting
Cost of metal cutting indicates the price associated with the making of the product.
Symbol: C
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Number of Rotations
Number of Rotations refers to the number of times the machine rotated about a fixed point.
Symbol: NOR
Measurement: NAUnit: Unitless
Note: Value can be positive or negative.
Tool Changing Time
Tool Changing Time is the average time required by the operator or automation system (such as automatic tool changer – ATC) to change the tool.
Symbol: TCT
Measurement: TimeUnit: s
Note: Value can be positive or negative.

Other formulas in Metal Cutting category

​Go Shear Angle
ϕ=atan(wcos(θ)1-wsin(θ))
​Go Shear Force
Fs=Fccos(θ)-Ptsin(θ)
​Go Shear Plane Angle
ϕ=arctan(rcos(α)1-rsin(α))
​Go Shear Strain
𝜂=tan(ϕ)+cot(ϕ-α)

How to Evaluate Maximum Production Rate?

Maximum Production Rate evaluator uses Maximum Production Rate = Cost of metal cutting/(((1/Number of Rotations-1)*Tool Changing Time)^Number of Rotations) to evaluate the Maximum Production Rate, Maximum Production Rate is the rate at which production is considered as profitable as per the economy of machining. Maximum Production Rate is denoted by PRmaximum symbol.

How to evaluate Maximum Production Rate using this online evaluator? To use this online evaluator for Maximum Production Rate, enter Cost of metal cutting (C), Number of Rotations (NOR) & Tool Changing Time (TCT) and hit the calculate button.

FAQs on Maximum Production Rate

What is the formula to find Maximum Production Rate?
The formula of Maximum Production Rate is expressed as Maximum Production Rate = Cost of metal cutting/(((1/Number of Rotations-1)*Tool Changing Time)^Number of Rotations). Here is an example- 59.4884 = 1000/(((1/2-1)*1.7)^2).
How to calculate Maximum Production Rate?
With Cost of metal cutting (C), Number of Rotations (NOR) & Tool Changing Time (TCT) we can find Maximum Production Rate using the formula - Maximum Production Rate = Cost of metal cutting/(((1/Number of Rotations-1)*Tool Changing Time)^Number of Rotations).
Copied!