Maximum Demand is defined as the peak power consumption of the load connected. Check FAQs
Max Demand=Demand FactorConnected Load
Max Demand - Maximum Demand?Demand Factor - Demand Factor?Connected Load - Connected Load?

Maximum Demand using Demand Factor Example

With values
With units
Only example

Here is how the Maximum Demand using Demand Factor equation looks like with Values.

Here is how the Maximum Demand using Demand Factor equation looks like with Units.

Here is how the Maximum Demand using Demand Factor equation looks like.

1692Edit=0.47Edit3600Edit
You are here -
HomeIcon Home » Category Engineering » Category Electrical » Category Power Plant Operations » fx Maximum Demand using Demand Factor

Maximum Demand using Demand Factor Solution

Follow our step by step solution on how to calculate Maximum Demand using Demand Factor?

FIRST Step Consider the formula
Max Demand=Demand FactorConnected Load
Next Step Substitute values of Variables
Max Demand=0.473600kW
Next Step Convert Units
Max Demand=0.473.6E+6W
Next Step Prepare to Evaluate
Max Demand=0.473.6E+6
Next Step Evaluate
Max Demand=1692000W
LAST Step Convert to Output's Unit
Max Demand=1692kW

Maximum Demand using Demand Factor Formula Elements

Variables
Maximum Demand
Maximum Demand is defined as the peak power consumption of the load connected.
Symbol: Max Demand
Measurement: PowerUnit: kW
Note: Value should be greater than 0.
Demand Factor
Demand Factor is the ratio of maximum demand to connected load.
Symbol: Demand Factor
Measurement: NAUnit: Unitless
Note: Value should be less than 1.0001.
Connected Load
Connected Load is defined as the total load connected to the plant at any point of time.
Symbol: Connected Load
Measurement: PowerUnit: kW
Note: Value should be greater than 0.

Other Formulas to find Maximum Demand

​Go Maximum Demand given Load Factor
Max Demand=Avg LoadLoad Factor

Other formulas in Power Plant Operational Factors category

​Go Average Load for Load Curve
Avg Load=AL24
​Go Load Factor given Average Load and Maximum Demand
Load Factor=Avg LoadMax Demand
​Go Unit Generated per Annum
Pg=Max DemandLoad Factor8760
​Go Demand Factor
Demand Factor=Max DemandConnected Load

How to Evaluate Maximum Demand using Demand Factor?

Maximum Demand using Demand Factor evaluator uses Maximum Demand = Demand Factor*Connected Load to evaluate the Maximum Demand, The Maximum Demand using Demand Factor is defined as the peak demand which is connected to the power plant at a certain time. Maximum Demand is denoted by Max Demand symbol.

How to evaluate Maximum Demand using Demand Factor using this online evaluator? To use this online evaluator for Maximum Demand using Demand Factor, enter Demand Factor (Demand Factor) & Connected Load (Connected Load) and hit the calculate button.

FAQs on Maximum Demand using Demand Factor

What is the formula to find Maximum Demand using Demand Factor?
The formula of Maximum Demand using Demand Factor is expressed as Maximum Demand = Demand Factor*Connected Load. Here is an example- 1.692 = 0.47*3600000.
How to calculate Maximum Demand using Demand Factor?
With Demand Factor (Demand Factor) & Connected Load (Connected Load) we can find Maximum Demand using Demand Factor using the formula - Maximum Demand = Demand Factor*Connected Load.
What are the other ways to Calculate Maximum Demand?
Here are the different ways to Calculate Maximum Demand-
  • Maximum Demand=Average Load/Load FactorOpenImg
Can the Maximum Demand using Demand Factor be negative?
No, the Maximum Demand using Demand Factor, measured in Power cannot be negative.
Which unit is used to measure Maximum Demand using Demand Factor?
Maximum Demand using Demand Factor is usually measured using the Kilowatt[kW] for Power. Watt[kW], Milliwatt[kW], Microwatt[kW] are the few other units in which Maximum Demand using Demand Factor can be measured.