Maximum Demand using Demand Factor evaluator uses Maximum Demand = Demand Factor*Connected Load to evaluate the Maximum Demand, The Maximum Demand using Demand Factor is defined as the peak demand which is connected to the power plant at a certain time. Maximum Demand is denoted by Max Demand symbol.
How to evaluate Maximum Demand using Demand Factor using this online evaluator? To use this online evaluator for Maximum Demand using Demand Factor, enter Demand Factor (Demand Factor) & Connected Load (Connected Load) and hit the calculate button.