Maximum Demand given Load Factor evaluator uses Maximum Demand = Average Load/Load Factor to evaluate the Maximum Demand, Maximum Demand given Load Factor is defined as the maximum raise in demand. It is generally measured in MW. Maximum Demand is denoted by Max Demand symbol.
How to evaluate Maximum Demand given Load Factor using this online evaluator? To use this online evaluator for Maximum Demand given Load Factor, enter Average Load (Avg Load) & Load Factor (Load Factor) and hit the calculate button.